{"id":71070,"date":"2024-10-17T14:32:20","date_gmt":"2024-10-17T14:32:20","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/asme-a112-18-1-2011\/"},"modified":"2024-10-24T18:54:43","modified_gmt":"2024-10-24T18:54:43","slug":"asme-a112-18-1-2011","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/asme\/asme-a112-18-1-2011\/","title":{"rendered":"ASME A112.18.1 2011"},"content":{"rendered":"
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
7<\/td>\n | Contents <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | ASME Standards Committee on Plumbing Materials and Equipment <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | ASME Project Team 18.1 \u2014 Plumbing Fixture Fittings <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | CSA Technical Committee on Plumbing Fittings <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | ASME\/ CSA Joint Harmonization Task Group on Plumbing Fittings <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | Preface <\/td>\n<\/tr>\n | ||||||
23<\/td>\n | 1 Scope 1.1 1.2 1.3 1.4 1.5 <\/td>\n<\/tr>\n | ||||||
24<\/td>\n | 2 Reference publications <\/td>\n<\/tr>\n | ||||||
25<\/td>\n | 3 Definitions and abbreviations 3.1 Definitions <\/td>\n<\/tr>\n | ||||||
29<\/td>\n | 3.2 Abbreviations 4 Design requirements 4.1 Supply fittings \n 4.1.1 Rated pressure <\/td>\n<\/tr>\n | ||||||
30<\/td>\n | 4.1.2 Rated temperatures 4.1.3 Seating members 4.2 Servicing 4.3 Installation 4.4 Threaded connections <\/td>\n<\/tr>\n | ||||||
31<\/td>\n | 4.5 Connections other than threaded connections 4.5.1 <\/td>\n<\/tr>\n | ||||||
32<\/td>\n | 4.6 Accessible designs 4.7 Backflow prevention 4.8 Cover plates and escutcheons 4.9 Toxicity 4.10 Frost- proof faucets and hydrants 4.11 Shower heads, body sprays, and hand- held showers 4.11.1 General <\/td>\n<\/tr>\n | ||||||
33<\/td>\n | 4.11.2 High- efficiency shower heads and hand- held showers 4.12 Cross- flow 4.13 Fittings incorporating electrical features 4.13.1 General 4.13.2 Testing <\/td>\n<\/tr>\n | ||||||
34<\/td>\n | 4.14 Materials 4.15 Automatic compensating valve temperature control 4.16 Lawn faucets 4.17 Flexible water connectors 5 Performance requirements and test procedures 5.1 General 5.1.1 Preconditioning 5.1.2 Installation for testing 5.1.3 Test conditions 5.1.4 Order of tests 5.2 Coatings \n 5.2.1 General <\/td>\n<\/tr>\n | ||||||
35<\/td>\n | 5.2.2 Corrosion ( all substrates and coatings) 5.2.3 Adhesion <\/td>\n<\/tr>\n | ||||||
36<\/td>\n | 5.2.4 Decorative organic coatings <\/td>\n<\/tr>\n | ||||||
37<\/td>\n | 5.3 Pressure and temperature 5.3.1 Static and dynamic seals 5.3.1 Static and dynamic seals 5.3.2 Burst pressure <\/td>\n<\/tr>\n | ||||||
38<\/td>\n | 5.3.3 Cross- flow check valves 5.3.4 Hose assemblies 5.3.5 Ball joints <\/td>\n<\/tr>\n | ||||||
39<\/td>\n | 5.3.6 Diverters 5.3.7 Aerators and other end point devices 5.4 Flow rate 5.4.1 Supply fittings 5.4.2 Test procedure <\/td>\n<\/tr>\n | ||||||
40<\/td>\n | 5.5 Operating requirements <\/td>\n<\/tr>\n | ||||||
41<\/td>\n | 5.6 Life cycle 5.6.1 Performance requirements <\/td>\n<\/tr>\n | ||||||
42<\/td>\n | 5.6.2 Test procedures <\/td>\n<\/tr>\n | ||||||
43<\/td>\n | 5.6.3 Fittings and other control devices <\/td>\n<\/tr>\n | ||||||
45<\/td>\n | 5.7 Resistance to installation loading 5.7.1 Bending strength <\/td>\n<\/tr>\n | ||||||
46<\/td>\n | 5.7.2 Thread torque strength \n 5.8 Resistance to use loading 5.8.1 Operating controls 5.8.2 Maintenance of installed position 5.8.3 Swing spout strength <\/td>\n<\/tr>\n | ||||||
47<\/td>\n | 5.9 Backflow prevention 5.9.1 General 5.9.2 Fittings with plain outlets <\/td>\n<\/tr>\n | ||||||
48<\/td>\n | 5.9.3 Fittings with submersible outlets <\/td>\n<\/tr>\n | ||||||
51<\/td>\n | 5.10 Automatic compensating valves 5.10.1 General 5.10.2 High- temperature conditioning test 5.10.3 Pressure and burst pressure test 5.10.4 Maximum torque or force adjustment <\/td>\n<\/tr>\n | ||||||
52<\/td>\n | 5.10.5 Life cycle test 5.10.5.1 Performance requirements 5.10.6 Temperature control <\/td>\n<\/tr>\n | ||||||
55<\/td>\n | 5.10.7 Supply line pressure loss 5.10.8 Temperature and high limit control <\/td>\n<\/tr>\n | ||||||
56<\/td>\n | 5.11 Lawn faucets 5.11.1 Performance requirements 5.11.2 Test procedure 5.12 Alternative materials test 5.12.1 Performance requirements 5.12.2 Test procedure 5.12.2.1 <\/td>\n<\/tr>\n | ||||||
57<\/td>\n | 5.13 High- efficiency shower heads and hand- held showers 5.13.1 General 5.13.2 Flow rate 5.13.3 Spray force <\/td>\n<\/tr>\n | ||||||
58<\/td>\n | 5.13.4 Spray coverage 5.13.4.1 Performance criteria <\/td>\n<\/tr>\n | ||||||
59<\/td>\n | 6 Markings, packaging, and installation instructions 6.1 General <\/td>\n<\/tr>\n | ||||||
60<\/td>\n | 6.2 Temperature identification 6.3 Packaging 6.3.1 6.4 Instructions for automatic compensating valves 6.5 High- efficiency shower heads and hand- held showers 6.5.1 <\/td>\n<\/tr>\n | ||||||
61<\/td>\n | Tables Table 1 Minimum and maximum flow rates <\/td>\n<\/tr>\n | ||||||
62<\/td>\n | Table 2 Operating requirements Table 3 Life cycle test <\/td>\n<\/tr>\n | ||||||
63<\/td>\n | Table 4 Thread torque strength Figures \n 1 Deck-mounted lavatory and sink supply fittings <\/td>\n<\/tr>\n | ||||||
64<\/td>\n | 2 Dimensions for 1\/2-14 NPSM shanks <\/td>\n<\/tr>\n | ||||||
65<\/td>\n | 3 Discharge capacity test schematics <\/td>\n<\/tr>\n | ||||||
66<\/td>\n | 4 Bending loads on supply fittings <\/td>\n<\/tr>\n | ||||||
67<\/td>\n | 5 Set-up for back siphonage and hidden check valve test <\/td>\n<\/tr>\n | ||||||
68<\/td>\n | 6 Set-up for check valve leakage test <\/td>\n<\/tr>\n | ||||||
69<\/td>\n | 7 Set-up for high-temperature conditioning, regulation and temperature variation, and cold water supply pressure loss tests 8 Set-up for life cycle test for automatic compensating valves <\/td>\n<\/tr>\n | ||||||
70<\/td>\n | 9 Spray force-balance test fixture <\/td>\n<\/tr>\n | ||||||
71<\/td>\n | 10 Spray force test fixture setup <\/td>\n<\/tr>\n | ||||||
72<\/td>\n | 11 Spray coverage test fixture <\/td>\n<\/tr>\n | ||||||
73<\/td>\n | 12 Spray coverage test fixture setup ring <\/td>\n<\/tr>\n | ||||||
74<\/td>\n | 13 Spray coverage test fixture setup <\/td>\n<\/tr>\n | ||||||
75<\/td>\n | Annexes A (informative) Unit conversion and rounding criteria <\/td>\n<\/tr>\n | ||||||
76<\/td>\n | B (normative) Tests by fitting type <\/td>\n<\/tr>\n | ||||||
78<\/td>\n | C (informative) Verifying the time constant of the temperature-measuring equipment C. 3 Examples <\/td>\n<\/tr>\n | ||||||
79<\/td>\n | Figure C. 1 Time constant graph <\/td>\n<\/tr>\n | ||||||
80<\/td>\n | D (informative) Temperature variation for pressure-balancing and thermostatic compensating valves Figure D. 1 Example of temperature increase spike <\/td>\n<\/tr>\n | ||||||
81<\/td>\n | Figure D. 2 Example of temperature decrease spike <\/td>\n<\/tr>\n | ||||||
82<\/td>\n | Figure D. 3 Example of temperature record for temperature increase spike <\/td>\n<\/tr>\n | ||||||
83<\/td>\n | Figure D. 4 Example of temperature record for temperature decrease spike <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" ASME A112.18.1 Plumbing supply fittings<\/b><\/p>\n |