{"id":435437,"date":"2024-10-20T07:49:39","date_gmt":"2024-10-20T07:49:39","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-en-iso-iec-170432023-tc\/"},"modified":"2024-10-26T14:49:34","modified_gmt":"2024-10-26T14:49:34","slug":"bs-en-iso-iec-170432023-tc","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-en-iso-iec-170432023-tc\/","title":{"rendered":"BS EN ISO\/IEC 17043:2023 – TC"},"content":{"rendered":"
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
1<\/td>\n | compares BS EN ISO\/IEC 17043:2023 <\/td>\n<\/tr>\n | ||||||
2<\/td>\n | TRACKED CHANGES Text example 1 \u2014 indicates added text (in green) <\/td>\n<\/tr>\n | ||||||
90<\/td>\n | undefined <\/td>\n<\/tr>\n | ||||||
92<\/td>\n | European foreword Endorsement notice <\/td>\n<\/tr>\n | ||||||
95<\/td>\n | Foreword <\/td>\n<\/tr>\n | ||||||
96<\/td>\n | Introduction <\/td>\n<\/tr>\n | ||||||
99<\/td>\n | 1 Scope 2 Normative references 3 Terms and definitions <\/td>\n<\/tr>\n | ||||||
101<\/td>\n | 4 General requirements 4.1 Impartiality <\/td>\n<\/tr>\n | ||||||
102<\/td>\n | 4.2 Confidentiality 5 Structural requirements <\/td>\n<\/tr>\n | ||||||
103<\/td>\n | 6 Resource requirements 6.1 General 6.2 Personnel <\/td>\n<\/tr>\n | ||||||
104<\/td>\n | 6.3 Facilities and environmental conditions <\/td>\n<\/tr>\n | ||||||
105<\/td>\n | 6.4 Externally provided products and services <\/td>\n<\/tr>\n | ||||||
106<\/td>\n | 7 Process requirements 7.1 Establishing, contracting and communicating the PT scheme objectives 7.1.1 Review of requests, tenders and contracts 7.1.2 PT scheme communication <\/td>\n<\/tr>\n | ||||||
107<\/td>\n | 7.2 Design and planning of a PT scheme 7.2.1 General <\/td>\n<\/tr>\n | ||||||
108<\/td>\n | 7.2.2 Statistical design <\/td>\n<\/tr>\n | ||||||
109<\/td>\n | 7.2.3 Determination of assigned values 7.3 Production and distribution of PT items 7.3.1 Production of PT items <\/td>\n<\/tr>\n | ||||||
110<\/td>\n | 7.3.2 Homogeneity and stability assessment of PT items 7.3.3 Handling and storage of PT items 7.3.4 Packaging, labelling and distribution of PT items <\/td>\n<\/tr>\n | ||||||
111<\/td>\n | 7.3.5 Instructions for participants <\/td>\n<\/tr>\n | ||||||
112<\/td>\n | 7.4 Evaluation and reporting of PT scheme results 7.4.1 Data analysis 7.4.2 Evaluation of performance <\/td>\n<\/tr>\n | ||||||
113<\/td>\n | 7.4.3 PT reports <\/td>\n<\/tr>\n | ||||||
114<\/td>\n | 7.5 Control of the PT scheme process 7.5.1 Technical records 7.5.2 Control of data and information management <\/td>\n<\/tr>\n | ||||||
115<\/td>\n | 7.5.3 Surveillance of the processes 7.5.4 Nonconforming work <\/td>\n<\/tr>\n | ||||||
116<\/td>\n | 7.6 Handling of complaints <\/td>\n<\/tr>\n | ||||||
117<\/td>\n | 7.7 Handling of appeals 8 Management system requirements 8.1 General requirements <\/td>\n<\/tr>\n | ||||||
118<\/td>\n | 8.2 Management system documentation 8.3 Control of management system documents 8.4 Control of records <\/td>\n<\/tr>\n | ||||||
119<\/td>\n | 8.5 Actions to address risks and opportunities 8.6 Improvement <\/td>\n<\/tr>\n | ||||||
120<\/td>\n | 8.7 Corrective actions 8.8 Internal audits <\/td>\n<\/tr>\n | ||||||
121<\/td>\n | 8.9 Management reviews <\/td>\n<\/tr>\n | ||||||
122<\/td>\n | Annex A (informative) Types of PT schemes <\/td>\n<\/tr>\n | ||||||
126<\/td>\n | Annex B (informative) Statistical methods for PT <\/td>\n<\/tr>\n | ||||||
134<\/td>\n | Bibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" Tracked Changes. Conformity assessment. General requirements for the competence of proficiency testing providers<\/b><\/p>\n |