{"id":359671,"date":"2024-10-20T01:27:17","date_gmt":"2024-10-20T01:27:17","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bsi-pd-iso-iec-ts-22237-32018\/"},"modified":"2024-10-26T02:10:19","modified_gmt":"2024-10-26T02:10:19","slug":"bsi-pd-iso-iec-ts-22237-32018","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bsi-pd-iso-iec-ts-22237-32018\/","title":{"rendered":"BSI PD ISO\/IEC TS 22237-3:2018"},"content":{"rendered":"
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
2<\/td>\n | National foreword <\/td>\n<\/tr>\n | ||||||
7<\/td>\n | Foreword <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | Introduction <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | 1 Scope 2 Normative references <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | 3 Terms, definitions and abbreviated terms 3.1 Terms and definitions <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | 3.2 Abbreviated terms <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | 4 Conformance 5 Power supply and distribution within data centres 5.1 General <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | 5.2 Dimensioning of power distribution systems <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | 6 Availability 6.1 General requirements 6.2 Power supply 6.2.1 Capacity planning <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | 6.2.2 Availability of the utility supply <\/td>\n<\/tr>\n | ||||||
22<\/td>\n | 6.2.3 Power quality 6.2.4 Load presented to the utility supply <\/td>\n<\/tr>\n | ||||||
23<\/td>\n | 6.2.5 Equipment <\/td>\n<\/tr>\n | ||||||
24<\/td>\n | 6.2.6 Availability Class design options <\/td>\n<\/tr>\n | ||||||
27<\/td>\n | 6.3 Power distribution 6.3.1 Capacity planning <\/td>\n<\/tr>\n | ||||||
29<\/td>\n | 6.3.2 Power quality 6.3.3 Equipment <\/td>\n<\/tr>\n | ||||||
30<\/td>\n | 6.3.4 Availability Class design options <\/td>\n<\/tr>\n | ||||||
32<\/td>\n | 6.4 Incorporation of LVDC distribution 6.5 Additional considerations 6.5.1 Lightning and surge protection 6.5.2 Segregation of power distribution cabling and information technology cabling 6.6 Emergency power off 6.6.1 Requirements 6.6.2 Recommendations 7 Physical security 7.1 General 7.2 Access 7.2.1 Power supply <\/td>\n<\/tr>\n | ||||||
33<\/td>\n | 7.2.2 Power distribution 7.2.3 Attachment of unauthorised end-equipment 7.2.4 Cabling infrastructure to support access control 7.3 Internal environmental events 7.3.1 Power supply 7.3.2 Power distribution 7.4 External environmental events 8 Energy efficiency enablement and power distribution 8.1 General <\/td>\n<\/tr>\n | ||||||
34<\/td>\n | 8.2 Granularity Level 1 8.2.1 Requirements 8.2.2 Recommendations <\/td>\n<\/tr>\n | ||||||
35<\/td>\n | 8.3 Granularity Level 2 8.3.1 Requirements 8.3.2 Recommendations 8.4 Granularity Level 3 8.4.1 Requirements 8.4.2 Recommendations 8.5 Cabling infrastructure to support energy efficiency enablement <\/td>\n<\/tr>\n | ||||||
36<\/td>\n | Annex A (informative) Example implementations of power distribution <\/td>\n<\/tr>\n | ||||||
39<\/td>\n | Bibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" Information technology. Data centre facilities and infrastructures – Power distribution<\/b><\/p>\n |