{"id":347159,"date":"2024-10-20T00:24:50","date_gmt":"2024-10-20T00:24:50","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-iso-iec-265552015\/"},"modified":"2024-10-25T23:54:10","modified_gmt":"2024-10-25T23:54:10","slug":"bs-iso-iec-265552015","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-iso-iec-265552015\/","title":{"rendered":"BS ISO\/IEC 26555:2015"},"content":{"rendered":"
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
8<\/td>\n | Foreword <\/td>\n<\/tr>\n | ||||||
9<\/td>\n | Introduction <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | 1\tScope 2\tNormative references 3\tTerms and definitions <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | 4\tReference model for product line technical management <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | 5\tProcess management <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | 5.1\tApplying process enabling processes for product lines 5.1.1\tEstablish process management group <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | 5.1.2\tAlign resources for process definition and improvements <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | 5.1.3\tGovern process definition and improvement 5.1.4\tPrepare process management and improvement <\/td>\n<\/tr>\n | ||||||
20<\/td>\n | 5.2\tDomain engineering process definition 5.2.1\tDefine domain engineering processes <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | 5.2.2\tValidate domain engineering processes 5.2.3\tDeploy the domain engineering processes <\/td>\n<\/tr>\n | ||||||
22<\/td>\n | 5.3\tApplication engineering process definition 5.3.1\tDefine application engineering processes <\/td>\n<\/tr>\n | ||||||
23<\/td>\n | 5.3.2\tValidate the conformance of application engineering processes with domain engineering processes <\/td>\n<\/tr>\n | ||||||
24<\/td>\n | 5.3.3\tDeploy the application engineering processes 5.4\tApplying process monitoring and control for product lines <\/td>\n<\/tr>\n | ||||||
25<\/td>\n | 5.4.1\tPlan for process monitoring and control 5.4.2\tDefine process performance measures <\/td>\n<\/tr>\n | ||||||
26<\/td>\n | 5.4.3\tMeasure and manage process performance 5.4.4\tCoordinate processes for improving reusability <\/td>\n<\/tr>\n | ||||||
27<\/td>\n | 5.5\tApplying process improvement for product lines 5.5.1\tAssess processes <\/td>\n<\/tr>\n | ||||||
28<\/td>\n | 5.5.2\tEstimate the impact of changes on processes 5.5.3\tPlan process improvement <\/td>\n<\/tr>\n | ||||||
29<\/td>\n | 5.5.4\tImplement process improvements 5.5.5\tEvaluate process improvement <\/td>\n<\/tr>\n | ||||||
30<\/td>\n | 6\tVariability management <\/td>\n<\/tr>\n | ||||||
31<\/td>\n | 6.1\tVariability modelling 6.1.1\tEstablish variability modeling policy <\/td>\n<\/tr>\n | ||||||
32<\/td>\n | 6.1.2\tCollect variability information <\/td>\n<\/tr>\n | ||||||
33<\/td>\n | 6.1.3\tVerify variability models 6.1.4\tShare and maintain variability models 6.2\tVariability mechanism <\/td>\n<\/tr>\n | ||||||
34<\/td>\n | 6.2.1\tEstablish variability mechanism management policy 6.2.2\tOperate variability mechanisms <\/td>\n<\/tr>\n | ||||||
35<\/td>\n | 6.2.3\tSupport variability mechanisms operation 6.3\tVariability documentation <\/td>\n<\/tr>\n | ||||||
36<\/td>\n | 6.3.1\tEstablish policies for variability documentation 6.3.2\tCollect annotations of variability models 6.3.3\tValidate the variability documentation <\/td>\n<\/tr>\n | ||||||
37<\/td>\n | 6.4\tVariability binding 6.4.1\tEstablish binding policy 6.4.2\tGuide trade-offs analysis among alternatives of binding time <\/td>\n<\/tr>\n | ||||||
38<\/td>\n | 6.4.3\tGuide binding time decision 6.4.4\tMaintain binding information <\/td>\n<\/tr>\n | ||||||
39<\/td>\n | 6.5\tVariability tracing 6.5.1\tEstablish policies for traceability management of variability models <\/td>\n<\/tr>\n | ||||||
40<\/td>\n | 6.5.2\tDefine links between variability model and domain assets 6.5.3\tManage the changes of the defined trace links 6.6\tVariability control and evolution <\/td>\n<\/tr>\n | ||||||
41<\/td>\n | 6.6.1\tIdentify and analyse the evolution needs of variants 6.6.2\tAdd or remove variants <\/td>\n<\/tr>\n | ||||||
42<\/td>\n | 6.6.3\tAdd or remove dependencies and constraints 6.6.4\tChange binding time <\/td>\n<\/tr>\n | ||||||
43<\/td>\n | 6.6.5\tMaintain the affected traceabilities 6.6.6\tProvide feedback for variabilities and the variability evolution process 7\tAsset Management <\/td>\n<\/tr>\n | ||||||
44<\/td>\n | 7.1\tAsset identification <\/td>\n<\/tr>\n | ||||||
45<\/td>\n | 7.1.1\tSet up and maintain organizational policies for managing assets 7.1.2\tIdentity asset candidates 7.1.3\tEstimate efforts necessary to create, reuse, and update domain assets <\/td>\n<\/tr>\n | ||||||
46<\/td>\n | 7.1.4\tDetermine assets 7.1.5\tElicit information necessary to reuse assets <\/td>\n<\/tr>\n | ||||||
47<\/td>\n | 7.2\tAsset base implementation 7.2.1\tEstablish the mining (retrieval) mechanism for assets <\/td>\n<\/tr>\n | ||||||
48<\/td>\n | 7.2.2\tDefine and implement the CRUD method for assets 7.2.3\tEstablish asset base <\/td>\n<\/tr>\n | ||||||
49<\/td>\n | 7.2.4\tEvaluate asset base 7.3\tAsset validation <\/td>\n<\/tr>\n | ||||||
50<\/td>\n | 7.3.1\tReview the selected assets 7.3.2\tReview asset configurations 7.3.3\tCreate and release baselines of assets <\/td>\n<\/tr>\n | ||||||
51<\/td>\n | 7.4\tAsset evolution (including change management) 7.4.1\tManage asset changes <\/td>\n<\/tr>\n | ||||||
52<\/td>\n | 7.4.2\tMaintain traceability of assets 7.4.3\tManage feedback and take appropriate evolution actions <\/td>\n<\/tr>\n | ||||||
53<\/td>\n | 7.4.4\tTransform the existing assets into assets to rehabilitate asset base 7.4.5\tDispose assets from asset base 8\tSupport management <\/td>\n<\/tr>\n | ||||||
54<\/td>\n | 8.1\tTechnical quality management <\/td>\n<\/tr>\n | ||||||
55<\/td>\n | 8.1.1\tEstablish technical quality management policy 8.1.2\tEstablish and maintain criteria for quality assurance 8.1.3\tPerform quality assurance according to criteria <\/td>\n<\/tr>\n | ||||||
56<\/td>\n | 8.1.4\tCommunicate and ensure resolution of noncompliance issues 8.2\tConfiguration management <\/td>\n<\/tr>\n | ||||||
57<\/td>\n | 8.2.1\tIdentify configurations of member products <\/td>\n<\/tr>\n | ||||||
58<\/td>\n | 8.2.2\tEstablish configuration tree for a product line <\/td>\n<\/tr>\n | ||||||
59<\/td>\n | 8.2.3\tManage configuration of variability in space 8.3\tDecision management <\/td>\n<\/tr>\n | ||||||
60<\/td>\n | 8.3.1\tEstablish decision management policy <\/td>\n<\/tr>\n | ||||||
61<\/td>\n | 8.3.2\tTailor decision procedure 8.3.3\tGuide the decision execution 8.3.4\tLearn from execution results <\/td>\n<\/tr>\n | ||||||
62<\/td>\n | 8.4\tTechnical risk management 8.4.1\tIdentify technical risks 8.4.2\tAssess technical risks <\/td>\n<\/tr>\n | ||||||
63<\/td>\n | 8.4.3\tDevelop technical risk mitigation plans 8.4.4\tActivate the mitigation plan <\/td>\n<\/tr>\n | ||||||
64<\/td>\n | 8.5\tTool management 8.5.1\tIdentify needs for tool management <\/td>\n<\/tr>\n | ||||||
65<\/td>\n | 8.5.2\tSelect and adapt tools 8.5.3\tSet up and maintain tools <\/td>\n<\/tr>\n | ||||||
66<\/td>\n | Annex\u00a0A (informative) Technical management and technical readiness levels (TRL) <\/td>\n<\/tr>\n | ||||||
67<\/td>\n | Annex\u00a0B (informative) Relationship with ISO\/IEC\u00a012207 processes <\/td>\n<\/tr>\n | ||||||
70<\/td>\n | Annex\u00a0C (informative) Construct for process, method, tool, and aspect <\/td>\n<\/tr>\n | ||||||
71<\/td>\n | Bibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" Software and systems engineering. Tools and methods for product line technical management<\/b><\/p>\n |