{"id":125524,"date":"2024-10-19T05:08:24","date_gmt":"2024-10-19T05:08:24","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/ieee-1010-2022-2\/"},"modified":"2024-10-24T23:15:40","modified_gmt":"2024-10-24T23:15:40","slug":"ieee-1010-2022-2","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/ieee\/ieee-1010-2022-2\/","title":{"rendered":"IEEE 1010-2022"},"content":{"rendered":"
Revision Standard – Active. Practicing engineers in the hydroelectric industry can use this guide as a reference document. Prevailing industry practices in hydroelectric power plant control system logic, control system configurations, and control modes are documented. The control and monitoring requirements for equipment and systems associated with conventional and pumped-storage hydroelectric power plants are described. Typical methods of local and remote control, details of the control interfaces for plant equipment, and requirements for centralized and off-site control are also included.<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
1<\/td>\n | IEEE Std 1010\u2122-2022 Front cover <\/td>\n<\/tr>\n | ||||||
2<\/td>\n | Title page <\/td>\n<\/tr>\n | ||||||
4<\/td>\n | Important Notices and Disclaimers Concerning IEEE Standards Documents <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | Participants <\/td>\n<\/tr>\n | ||||||
9<\/td>\n | Introduction <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | Contents <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | List of Figures <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | List of Tables <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | 1.\u2002Overview 1.1\u2002Scope 1.2\u2002Purpose <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | 1.3\u2002Word usage 2.\u2002Normative references 3.\u2002Definitions 3.1\u2002Definitions <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | 3.2\u2002Acronyms and abbreviations <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | 4.\u2002Control system configuration 4.1\u2002Introduction 4.2\u2002Hydroelectric power plant control system evolution <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | 4.3\u2002Basic control system concepts <\/td>\n<\/tr>\n | ||||||
23<\/td>\n | 4.4\u2002Basic control functions <\/td>\n<\/tr>\n | ||||||
25<\/td>\n | 4.5\u2002System architecture <\/td>\n<\/tr>\n | ||||||
28<\/td>\n | 5.\u2002Control and monitoring of plant equipment 5.1\u2002General <\/td>\n<\/tr>\n | ||||||
30<\/td>\n | 5.2\u2002Information and control signals 5.3\u2002Control system interfaces <\/td>\n<\/tr>\n | ||||||
70<\/td>\n | 6.\u2002Control sequencing-generating units <\/td>\n<\/tr>\n | ||||||
71<\/td>\n | 6.1\u2002Steps in the starting sequence <\/td>\n<\/tr>\n | ||||||
78<\/td>\n | 6.2\u2002Automation of the control system <\/td>\n<\/tr>\n | ||||||
80<\/td>\n | 7.\u2002Control sequencing\u2014Pumped-storage units 7.1\u2002Steps in the starting sequence <\/td>\n<\/tr>\n | ||||||
87<\/td>\n | 7.2\u2002Unit shutdown <\/td>\n<\/tr>\n | ||||||
89<\/td>\n | 7.3\u2002Control sequence automation <\/td>\n<\/tr>\n | ||||||
90<\/td>\n | 8.\u2002Plant-level control 8.1\u2002General <\/td>\n<\/tr>\n | ||||||
92<\/td>\n | 8.2\u2002Control system hardware requirements <\/td>\n<\/tr>\n | ||||||
93<\/td>\n | 9.\u2002Off-site control <\/td>\n<\/tr>\n | ||||||
94<\/td>\n | Annex\u00a0A (informative) Bibliography <\/td>\n<\/tr>\n | ||||||
95<\/td>\n | Back cover <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" IEEE Guide for Control of Hydroelectric Power Plants (Redline)<\/b><\/p>\n |