IEEE 15289-2019
$60.67
ISO/IEC/IEEE International Standard — Systems and software engineering – Content of life-cycle information items (documentation)
Published By | Publication Date | Number of Pages |
IEEE | 2019 |
Revision Standard – Active. The purpose and content of all identified systems and software life cycle and service management information items (documentation) are specified in this document. The information item contents are defined according to generic document types (description, plan, policy, procedure, report, request, and specification) and the specific purpose of the document. This document provides a mapping of ISO/IEC/IEEE 15288:2015 and ISO/IEC/IEEE 12207:2017 clauses with a set of information items. This document identifies records and information items based on analysis of references in ISO/IEC/IEEE 15288:2015 and ISO/IEC/IEEE 12207:2017, which in some cases provide partial or complete outlines for the content of specific documents. Information items may be combined or subdivided as needed for project or organizational purposes.
PDF Catalog
PDF Pages | PDF Title |
---|---|
1 | ISO/IEC/IEEE 15289-2019 Front Cover |
6 | Foreword |
7 | Introduction |
9 | 1 Scope |
10 | 2 Normative references 3 Terms, definitions and abbreviated terms 3.1 Terms and definitions |
13 | 3.2 Abbreviated terms 4 Applicability 4.1 Purpose |
14 | 4.2 Intended users of this document 4.3 Applicability to work efforts 4.4 Applicability to information item audiences |
15 | 5 Conformance 5.1 Definition of conformance 5.2 Conformance situations |
16 | 5.3 Type of conformance 6 Life-cycle data and information items 6.1 Life-cycle data characteristics 6.2 Records compared to information items (documents) |
17 | 6.3 Management of life-cycle data (records) 6.4 Management of information items (documents) 6.4.1 General |
18 | 6.4.2 Developing the information management plan 6.4.3 Managing and controlling information items 7 Generic types of information items 7.1 Use of generic types |
19 | 7.2 Description — Generic content 7.3 Plan — Generic content |
21 | 7.4 Policy — Generic content 7.5 Procedure — Generic content |
22 | 7.6 Report — Generic content |
23 | 7.7 Request — Generic content |
24 | 7.8 Specification — Generic content |
25 | 8 Mapping of information items to the life cycle processes 8.1 The process model |
26 | 8.2 Mapping Considerations 8.3 Mapping of information items to the system life cycle |
31 | 8.4 Mapping of information items to the software life cycle |
38 | 9 Records 9.1 General |
39 | 9.2 Record — Generic content 9.3 Specific record contents |
43 | 10 Specific information item (document) contents 10.1 General |
44 | 10.2 Acceptance plan 10.3 Acceptance report 10.4 Acquisition plan |
45 | 10.5 Capacity plan 10.6 Change request |
46 | 10.7 Complaint procedure 10.8 Concept of operations |
47 | 10.9 Configuration management plan 10.10 Configuration management procedure |
48 | 10.11 Configuration status report 10.12 Contract |
49 | 10.13 Customer satisfaction survey 10.14 Database design description |
50 | 10.15 Design description |
51 | 10.16 Development plan 10.17 Evaluation report |
52 | 10.18 Implementation procedure 10.19 Improvement plan |
53 | 10.20 Incident management procedure 10.21 Incident report |
54 | 10.22 Information management plan 10.23 Information management procedure |
55 | 10.24 Information security plan 10.25 Installation report |
56 | 10.26 Integration and test report 10.27 Integration plan 10.28 Interface description |
57 | 10.29 Life-cycle policy 10.30 Life-cycle procedure 10.31 Maintenance plan |
58 | 10.32 Maintenance procedure 10.33 Measurement procedure 10.34 Monitoring and control report 10.35 Operational concept |
59 | 10.36 Problem management procedure 10.37 Problem report |
60 | 10.38 Process description 10.39 Process improvement report |
61 | 10.40 Product need assessment 10.41 Progress report 10.42 Project management plan |
63 | 10.43 Proposal 10.44 Quality management plan 10.45 Quality management policy |
64 | 10.46 Quality management procedure 10.47 Release plan |
65 | 10.48 Request for proposal (RFP) 10.49 Resource request 10.50 Review minutes |
66 | 10.51 Risk action request 10.52 Risk management plan 10.53 Service catalog 10.54 Service continuity and availability plan |
67 | 10.55 Service level agreement (SLA) 10.56 Service report |
68 | 10.57 Supplier management procedure 10.58 System architecture description |
69 | 10.59 System element description 10.60 System requirements specification |
70 | 10.61 Test procedure |
71 | 10.62 Test report 10.63 Training documentation 10.64 Training plan 10.65 Transition plan |
72 | 10.66 Transition procedure 10.67 User documentation |
73 | 10.68 User notification 10.69 Validation plan 10.70 Validation procedure |
74 | 10.71 Validation report 10.72 Verification plan |
75 | 10.73 Verification procedure 10.74 Verification report |
76 | Annex A (informative) Procedure for identifying information items and their contents |
77 | Annex B (informative) Information items and records by source |
80 | Bibliography |
82 | IEEE notices and abstract |