BSI DD IEC/TS 62257-6:2005 2006
$102.76
Recommendations for small renewable energy and hybrid systems for rural electrification – Acceptance, operation, maintenance and replacement
Published By | Publication Date | Number of Pages |
BSI | 2006 | 20 |
Describes the various rules to be applied for acceptance, operation, maintenance and replacement of decentralized rural electrification systems which are designed to supply electric power for sites which are not connected to a large interconnected system, or a national grid, in order to meet basic needs.
PDF Catalog
PDF Pages | PDF Title |
---|---|
6 | 1 Scope 2 Normative reference 3 Terms and definitions |
7 | 4 General aspects 4.1 Introduction to AOMR actions |
10 | 4.2 Conditions impacting AOMR actions and guidelines 4.2.1 Characteristics of the project/systems to be managed 4.2.2 Organization of AOMR personnel and responsibilities |
12 | 4.2.3 Needed technical capabilities of AOMR participants 4.3 Training |
13 | 5 Rules for systems 5.1 System identification and operational data record keeping 5.2 Organizational issues 5.2.1 System limit definition of the AOMR domain 5.2.2 Planning of AOMR actions |
14 | 5.2.3 Traceability of AOMR actions 5.3 Technical issues 5.3.1 Electrical safety |
15 | 5.4 Acceptance issues 5.5 Recommended practices for intervention 5.6 Maintenance actions |
16 | 5.7 Replacement factors |
17 | 5.8 Analysis of the conformity of the delivered service to the contractual commitments 6 Rules for electric equipment 6.1 General aspects 6.2 Specific aspects related to electric equipment |
18 | 6.2.1 Acceptance test 6.2.2 Recommended practices for intervention 6.2.3 Maintenance actions 6.2.4 Replacement factors 6.2.4.1 General |
19 | 6.2.4.2 Replacing equipment |