BS ISO 24675-1:2022
$142.49
Railway Applications. Running time calculation for timetabling – Requirements
Published By | Publication Date | Number of Pages |
BSI | 2022 | 30 |
PDF Catalog
PDF Pages | PDF Title |
---|---|
2 | National foreword |
6 | Foreword |
7 | Introduction |
9 | 1 Scope 2 Normative references 3 Terms and definitions 3.1 General |
10 | 3.2 Infrastructure 3.3 Rolling stock |
11 | 4 Purpose and range of running time calculation 5 Requirements of shortest running time calculation 5.1 General |
12 | 5.2 Infrastructure parameters 5.2.1 General 5.2.2 Range of calculation 5.2.3 Gradient 5.2.4 Allowed maximum speed 5.2.5 Speed limits from infrastructure conditions |
13 | 5.2.6 Other 5.3 Rolling stock condition parameters 5.3.1 General 5.3.2 Mass 5.3.3 Maximum operational speed of rolling stock 5.3.4 Train length 5.3.5 Unit running resistance force 5.3.6 Tractive force 5.3.7 Braking deceleration 5.4 Operational condition parameters 5.4.1 General 5.4.2 Stopping / passing |
14 | 5.4.3 Maximum speed on operational condition 6 Verification of the influence of the parameters in the shortest running time calculation |
29 | Bibliography |