BS ISO 21573-2:2020:2021 Edition
$198.66
Building construction machinery and equipment. Concrete pumps – Procedure for examination of technical parameters
Published By | Publication Date | Number of Pages |
BSI | 2021 | 54 |
This document specifies the procedure and requirements for examining the technical commercial specifications of factory new piston-type concrete pump and rotary-type concrete pump as defined in ISO 21573-1.
It applies to mobile concrete pumps (with or without concrete-placing boom) and stationary concrete pumps.
PDF Catalog
PDF Pages | PDF Title |
---|---|
2 | undefined |
7 | Foreword |
9 | 1 Scope 2 Normative references 3 Terms and definitions |
10 | 4 Test items of performances 5 Overall parameters 5.1 Operating mass 5.1.1 Measuring conditions 5.1.2 Measuring apparatus and accuracy requirement 5.1.3 Measuring procedure |
12 | 5.2 Overall dimensions 5.2.1 Conditions for taking measurements 5.2.2 Measuring apparatus and accuracy requirement 5.2.3 Measuring procedure |
18 | 6 Pumping performance 6.1 Piston pump 6.1.1 Pumping output |
23 | 6.1.2 Concrete delivery pressure |
24 | 6.2 Rotary pump 6.2.1 Single-roller rotary pump (see A.1) |
27 | 6.2.2 Double-roller rotary pump (see A.2) |
29 | 7 Feeding height of hopper 7.1 Measuring conditions |
30 | 7.2 Measurement equipment and accuracy requirement 7.3 Measuring procedure 8 Performance of water pump 8.1 Measuring conditions |
31 | 8.2 Measurement equipment and accuracy requirement 8.3 Measuring procedure 8.3.1 Relief pressure of water system 8.3.2 Water output without load 9 Performance of concrete-placing boom 9.1 Measuring conditions 9.2 Measurement equipment and accuracy requirement |
32 | 9.3 Measuring procedure 9.3.1 Maximum length of the concrete-placing boom |
33 | 9.3.2 Maximum height of the concrete-placing boom 9.3.3 Concrete-placing boom section folding angle 9.3.4 Length of concrete-placing boom section |
34 | 9.3.5 Concrete-placing boom operation zone 9.3.6 Minimum unfolding/folding time and average speed of concrete-placing boom section |
35 | 9.3.7 Maximum slewing speed |
36 | 9.3.8 Maximum slewing angle |
37 | 9.3.9 Concrete-placing boom system pressure |
39 | 10 Performance of outriggers 10.1 Span of outrigger 10.1.1 Measuring conditions 10.1.2 Measurement equipment and accuracy requirement 10.1.3 Measuring procedure |
41 | 10.2 Maximum load on each outrigger 10.2.1 Measuring conditions 10.2.2 Measuring apparatus and accuracy requirement 10.2.3 Measuring procedure |
42 | 10.3 Speed of outriggers movement 10.3.1 Measuring conditions 10.3.2 Measuring apparatus and accuracy requirement 10.3.3 Measuring procedure |
45 | 10.4 Outriggers system pressure 10.4.1 Measuring conditions 10.4.2 Measuring apparatus and accuracy requirement 10.4.3 Measuring procedure |
47 | Annex A (informative) Theoretic pumping output and delivery pressure of rotary pump |