BS EN 50518-2:2010:2011 Edition
$102.76
Monitoring and alarm receiving centre – Technical requirements
Published By | Publication Date | Number of Pages |
BSI | 2011 | 16 |
If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]
This part of EN 50518 specifies the technical requirements of an ARC. This also includes functional performance criteria and verification of performance.
Status | Withdrawn |
---|---|
Title | Monitoring and alarm receiving centre – Technical requirements |
Publisher | BSI |
Committee | GW/1/11 |
Pages | 16 |
Publication Date | 2011-09-30 |
Withdrawn Date | 2014-09-30 |
Replaced By | BS EN 50518-2:2013 |
ISBN | 978 0 580 63373 7 |
Standard Number | BS EN 50518-2:2010 |
Identical National Standard Of | EN 50518-2:2010 |
Descriptors | Call centres, Remote control systems, Communication equipment, Telecommunication systems, Records (documents), Security systems in buildings, Burglar alarms, Testing, Warning devices, Anti-burglar measures, Alarm systems, Signals, Signal transmission |
ICS Codes | 13.320 - Alarm and warning systems |
Related products
-
BS EN 50588-1:2017
Medium power transformers 50 Hz, with highest voltage for equipment not exceeding 36 kV –…
-
BS EN 50588-2:2018 – TC:2020 Edition
Tracked Changes. Medium power transformers 50 Hz, with highest voltage for equipment not exceeding 36…
-
BS EN 50518-3:2013:2014 Edition
Monitoring and alarm receiving centre – Procedures and requirements for operation Published By Publication Date…
-
BSI 16/30335765 DC:2016 Edition
BS EN 50588-1 AMD1. Medium power transformers 50 Hz, with highest voltage for equipment not…
-
BS 5979:2007
Remote centres receiving signals from fire and security systems. Code of practice Published By Publication…
-
BS EN 50618:2014:2015 Edition
Electric cables for photovoltaic systems (BT(DE/NOT)258) Published By Publication Date Number of Pages BSI 2015…
-
BS EN 50588-2:2018
Medium power transformers 50 Hz, with highest voltage for equipment not exceeding 36 kV –…
-
BS EN 50588-3:2018 – TC:2020 Edition
Tracked Changes. Medium power transformers 50 Hz, with highest voltage for equipment not exceeding 36…
-
BS EN 50318:2018+A1:2022
Railway applications. Current collection systems. Validation of simulation of the dynamic interaction between pantograph and…
-
BS EN 50516-2-1:2011
Industrial connector sets and interconnect components to be used in optical fibre control and communication…
-
BS EN 50708-1-1:2020:2021 Edition
Power transformers. Additional European requirements – Common part. General requirements Published By Publication Date Number…
-
BS EN 50588-3:2018
Medium power transformers 50 Hz, with highest voltage for equipment not exceeding 36 kV –…
-
BS EN 50514:2014
Audio, video and information technology equipment. Routine electrical safety testing in production Published By Publication…
-
BS EN 50548:2011+A2:2014:2015 Edition
Junction boxes for photovoltaic modules Published By Publication Date Number of Pages BSI 2015 46
-
BS EN 50598-1:2014:2015 Edition
Ecodesign for power drive systems, motor starters, power electronics & their driven applications – General…
-
BS EN 50518:2019+A1:2023
Monitoring and Alarm Receiving Centre Published By Publication Date Number of Pages BSI 2023 50
-
BSI 20/30422215 DC:2020 Edition
BS EN 50318 AMD AA. Railway applications. Current collection systems. Validation of simulation of the…
-
BS EN 50514:2008:2009 Edition
Audio, video and information technology equipment. Routine electrical safety testing in production Published By Publication…
-
BS EN 50519:2010
Assessment of workers’ exposure to electric and magnetic fields of industrial induction heating equipment Published…
-
BS EN 50528:2024
Insulating ladders for use on or near low voltage electrical installations Published By Publication Date…
-
BS EN 50518-2:2013:2014 Edition
Monitoring and alarm receiving centre – Technical requirements Published By Publication Date Number of Pages…
-
BS EN 50518-1:2013:2014 Edition
Monitoring and alarm receiving centre – Location and construction requirements Published By Publication Date Number…
-
BS EN IEC 63000:2018 – TC:2019 Edition
Tracked Changes. Technical documentation for the assessment of electrical and electronic products with respect to…
-
BS EN 50528:2010
Insulating ladders for use on or near low voltage electrical installations Published By Publication Date…
-
BS EN 50518-1:2010:2011 Edition
Monitoring and alarm receiving centre – Location and construction requirements Published By Publication Date Number…
-
BS EN IEC 63000:2018
Technical documentation for the assessment of electrical and electronic products with respect to the restriction…
-
BS 5501-5:1977
Electrical apparatus for potentially explosive atmospheres – Flameproof enclosure ‘d’ Published By Publication Date Number…
-
BS EN 50541-1:2011
Three phase dry-type distribution transformers 50 Hz, from 100 kVA to 3150 kVA, with highest…
-
BS EN 50588-1:2015+A1:2016:2017 Edition
Medium power transformers 50 Hz, with highest voltage for equipment not exceeding 36 kV –…
-
BS EN 50518:2019
Monitoring and Alarm Receiving Centre Published By Publication Date Number of Pages BSI 2019 50
-
BS EN 50464-1:2007+A1:2012
Three-phase oil-immersed distribution transformers 50 Hz, from 50 kVA to 2 500 kVA with highest…
-
BS 9518:2021
Processing of alarm signals by an alarm receiving centre. Code of practice Published By Publication…
-
BS EN 61800-9-1:2017
Adjustable speed electrical power drive systems – Ecodesign for power drive systems, motor starters, power…
-
BS EN 50018:2000:2006 Edition
Electrical apparatus for potentially explosive atmospheres. Flameproof enclosure ‘d’ Published By Publication Date Number of…
-
BS EN 50598-2:2014+A1:2016
Ecodesign for power drive systems, motor starters, power electronics & their driven applications – Energy…
-
BS EN 50518-3:2011
Monitoring and alarm receiving centre – Procedures and requirements for operation Published By Publication Date…
-
BS EN 50588-4:2018
Medium power transformers 50 Hz, with highest voltage for equipment not exceeding 36 kV –…
-
BS EN 61800-9-2:2017
Adjustable speed electrical power drive systems – Ecodesign for power drive systems, motor starters, power…
-
BS EN 50318:2018
Railway applications. Current collection systems. Validation of simulation of the dynamic interaction between pantograph and…
-
BS EN 50588-4:2018 – TC:2020 Edition
Tracked Changes. Medium power transformers 50 Hz, with highest voltage for equipment not exceeding 36…