BS EN 50131-8:2019
$167.15
Alarm systems. Intrusion and hold-up systems – Security fog devices
Published By | Publication Date | Number of Pages |
BSI | 2019 | 34 |
This document specifies the requirements for Security Fog Devices as part of an I&HAS. It covers application and performance and also gives the necessary tests and trials to ensure efficiency and reliability of such obscuration devices.
This document also gives guidance on the criteria for design, installation, operation and maintenance of Security Fog Devices.
PDF Catalog
PDF Pages | PDF Title |
---|---|
2 | undefined |
10 | 1 Scope 2 Normative references 3 Terms, definitions and abbreviations 3.1 Terms and definitions |
12 | 3.2 Abbreviations 4 Environmental requirements 4.1 Environmental classification 4.2 Environmental tests 4.3 Immunity to electromagnetic interferences |
13 | 4.4 IP/IK rating 5 Access levels 6 Protection requirements 6.1 General 6.2 Product safety 6.3 EMC 6.4 Non-toxicity |
14 | 6.5 Pressure vessels requirements 6.6 Labels and warnings 6.7 Energy efficiency |
15 | 6.8 Warning signs 7 Functional requirements 7.1 Performance 7.2 Operation during mains failure 7.3 Operation with mains only 7.4 Additional requirement for equipment using radio frequency interconnections 7.5 Tamper 7.6 SFD damage/neutralisation |
16 | 7.7 Ejection nozzle 7.7.1 Nozzle protection 7.7.2 Nozzle blocked or obstructed 7.8 Fog eject limiter 7.9 Stopping fog generation 7.10 Heater block – temperature 7.11 Heater block – overheating 7.12 Isolation of the SFD 7.13 Fixings 7.14 Visual Indications 7.15 Communication between the SFD and the I&HAS 7.15.1 General |
17 | 7.15.2 Minimum information to be communicated 7.15.3 Non-critical faults 7.15.4 Optional signals 7.16 Fault monitoring 7.17 Power failure 8 Consumables 8.1 General 8.2 Formulation |
18 | 8.3 Traceability 9 Marking 10 Documentation 11 Design, installation, operation and maintenance |
19 | Annex A (normative)Performance tests A.1 General A.2 Fog test chamber A.3 Test procedure |
20 | A.4 Activation test A.5 Fog output of EUT |
21 | A.6 Fog persistency A.7 Fog output over test periods A.8 Fog visibility/density table |
22 | A.9 Performance data |
25 | Annex B (normative)SFD warning sign B.1 Warning sign requirements |
27 | Annex C (normative)Measurement procedure for power in idle mode C.1 Test room (EN 50564:2011, 4.2) C.2 Power supply (EN 50564:2011, 4.3) C.3 Measuring instruments (EN 50564:2011, 4.4) C.4 Preparation of unit under test (EN 50564:2011, 5.2) |
28 | C.5 Test setup C.6 Measurement (EN 50564:2011, 5.3.2) C.7 Reporting |
30 | Annex D (informative)Guidance on design, installation, operationand maintenance of the SFD D.1 Risk assessment D.2 General notification D.3 Verified alarm triggering D.4 Multi-occupancy D.5 Man trap – building unoccupied |
31 | D.6 Hold-up – Building occupied D.7 Installed SFD test D.8 Training D.9 Manufacturers requirements |