BS EN 197-2:2020
$142.49
Cement – Assessment and verification of constancy of performance
Published By | Publication Date | Number of Pages |
BSI | 2020 | 24 |
This document specifies the scheme for the assessment and verification of constancy of performance (AVCP) of cements, including certification of constancy of performance.
The document provides technical rules for factory production control, further testing of samples taken at the manufacturing plant (autocontrol testing) and assessment of the performance of the cement, initial inspection of the manufacturing plant and of factory production control, continuing surveillance, assessment and evaluation of factory production control and audit-testing of samples. It also provides rules for actions to be followed in the event of non-conformity and requirements for depots.
In this document, the word “cement” is used to refer both to common cements as defined in EN 197‑1 and to other cements and binders for which the relevant product specification standard makes reference to this document and which are submitted for certification. Such a cement is produced at a given factory and belongs to a particular type and a particular strength class, as defined and specified in the relevant product specification standard.
The guidelines given in the Technical Report CEN/TR 14245 [1] contain information for the application of this document.
This document is linked with the Annexes ZA of European Standards covering cements and binders, i.e. EN 197‑1, EN 14216, EN 14647, EN 413‑1 and EN 15743.
NOTE The reason for having drafted this separate document is that the provisions it includes are applicable to different products covered by different European Standards.
PDF Catalog
PDF Pages | PDF Title |
---|---|
2 | undefined |
7 | 1 Scope 2 Normative references 3 Terms and definitions |
9 | 4 Factory production control 4.1 General requirements 4.1.1 Concept 4.1.2 Works’ quality documentation |
10 | 4.1.3 Quality management system 4.1.3.1 Quality policy statement 4.1.3.2 Quality manager 4.1.3.3 Internal audits and management review 4.1.3.4 Training 4.1.4 System of documentation 4.1.4.1 Document control 4.1.4.2 Quality records |
11 | 4.2 Internal quality control 4.2.1 Process control 4.2.1.1 General 4.2.1.2 Constituents and composition of cement 4.2.1.3 Control of off-specification production or non-conformity 4.2.2 Measuring and testing 4.2.2.1 Inspection, measuring and test equipment 4.2.2.2 Inspection and test status 4.2.3 Handling, storage, packaging and delivery 4.3 Autocontrol testing of samples 4.3.1 Sampling and testing |
12 | 4.3.2 Corrective action 4.3.3 Measuring and test equipment for autocontrol testing 4.3.4 Quality records 5 Tasks for the purpose of certification 5.1 Assessment of the performance of the cement |
13 | 5.2 Initial inspection of the manufacturing plant and of factory production control 5.2.1 Inspection of a new factory 5.2.2 Inspection of an existing factory 5.2.3 Criteria for the assessment of the production equipment 5.2.4 Criteria for the assessment of laboratories |
14 | 5.3 Continuing surveillance, assessment and evaluation of factory production control 5.3.1 Inspection of the factory and the factory production control 5.3.2 Evaluation of the results of autocontrol testing of samples 5.4 Audit-testing of samples taken at the factory/depot 5.4.1 Sampling |
15 | 5.4.2 Testing 5.4.3 Evaluation of test results 5.5 Reports |
16 | 5.6 Actions to be taken in the event of non-conformity 5.6.1 Following inspection of the factory production control and evaluation of the results of autocontrol testing 5.6.2 Following evaluation of the results of the audit-testing 6 Procedure for certification of constancy of performance of the product |
19 | Annex A (normative)Evaluation of the representativeness and the accuracy of the 28 day strength test results A.1 General A.2 Sets of results considered A.3 Evaluation procedure A.3.1 Introduction A.3.2 Symbols |
20 | A.3.3 Evaluation of whether set A and set B belong to the same population (sampling error check) |
21 | A.3.4 Comparison between set B and set C in order to check the accuracy of the autocontrol testing (testing error check) A.3.5 Masonry cement A.3.6 Calcium aluminate cement |
22 | Annex B (informative)Procedure for certification of constancy of performance of cement |