{"id":80121,"date":"2024-10-17T18:41:09","date_gmt":"2024-10-17T18:41:09","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/ieee-1404-1998\/"},"modified":"2024-10-24T19:42:30","modified_gmt":"2024-10-24T19:42:30","slug":"ieee-1404-1998","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/ieee\/ieee-1404-1998\/","title":{"rendered":"IEEE 1404 1998"},"content":{"rendered":"
New IEEE Standard – Inactive – Withdrawn. The needs and requirements specific to the design, procurement, construction, maintenance, and operation of a microwave system are addressed. Steps for a variety of applications have been included in this guide; however, users should select only those steps that apply to their particular system(s) and their procurement policies.<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
1<\/td>\n | Title Page <\/td>\n<\/tr>\n | ||||||
3<\/td>\n | Introduction Participants <\/td>\n<\/tr>\n | ||||||
5<\/td>\n | CONTENTS <\/td>\n<\/tr>\n | ||||||
7<\/td>\n | 1. Overview 1.1 Scope 1.2 Purpose <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | 2. References <\/td>\n<\/tr>\n | ||||||
9<\/td>\n | 3. Acronyms <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | 4. Professional assistance requirements 5. Assignment of responsibility 5.1 Engineering 5.2 Procurement 5.3 Implementation <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | 5.4 Operation 5.5 Maintenance 5.6 Legal 6. Design requirements <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | 6.1 User needs assessment <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | 6.2 Channel requirements <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | 6.3 Technical characteristics <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | 6.4 Microwave path requirements <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | 6.5 FAA notification and approval <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | 6.6 FCC licensing requirements <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | 6.7 Facility requirements <\/td>\n<\/tr>\n | ||||||
28<\/td>\n | 7. Procurement 7.1 Information search [request for information (RFI)] 7.2 Purchase concept 7.3 Procurement document <\/td>\n<\/tr>\n | ||||||
30<\/td>\n | 7.4 Pre-purchase conference 7.5 Proposal\/bid evaluation 7.6 Contract negotiations and award of contract 8. Construction <\/td>\n<\/tr>\n | ||||||
31<\/td>\n | 8.1 Pre-construction conference 8.2 Notice to proceed (NTP) 8.3 Project implementation management 8.4 Permitting 8.5 Site inspections <\/td>\n<\/tr>\n | ||||||
32<\/td>\n | 8.6 Installation inspections 8.7 Performance verification <\/td>\n<\/tr>\n | ||||||
33<\/td>\n | 8.8 Final acceptance <\/td>\n<\/tr>\n | ||||||
34<\/td>\n | 9. Maintenance 9.1 Quality level 9.2 Network monitor 9.3 In-house maintenance 9.4 Contract maintenance <\/td>\n<\/tr>\n | ||||||
35<\/td>\n | 9.5 Response time specifications 10. Training 10.1 Administration 10.2 Operational 10.3 Manuals <\/td>\n<\/tr>\n | ||||||
36<\/td>\n | 10.4 Repair 10.5 On-site 10.6 Factory 11. Operational requirements 11.1 System management 11.2 Maintenance 11.3 Training <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" IEEE Guide for Microwave Communications System Development: Design, Procurement, Construction, Maintenance and Operation<\/b><\/p>\n |