{"id":343435,"date":"2024-10-20T00:06:20","date_gmt":"2024-10-20T00:06:20","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-en-60300-3-112009\/"},"modified":"2024-10-25T23:24:15","modified_gmt":"2024-10-25T23:24:15","slug":"bs-en-60300-3-112009","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-en-60300-3-112009\/","title":{"rendered":"BS EN 60300-3-11:2009"},"content":{"rendered":"

IEC 60300-3-11:2009 provides guidelines for the development of failure management policies for equipment and structures using reliability centred maintenance (RCM) analysis techniques. This part serves as an application guide and is an extension of IEC 60300-3-10, IEC 60300-3-12 and IEC 60300-3-14. Maintenance activities recommended in all three standards, which relate to preventive maintenance, may be implemented using this standard. The previous edition was based on ATA1-MGS-3; whereas this edition applies to all industries and defines a revised RCM algorithm and approach to the analysis process.<\/p>\n

PDF Catalog<\/h4>\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n
PDF Pages<\/th>\nPDF Title<\/th>\n<\/tr>\n
6<\/td>\nEnglish
CONTENTS <\/td>\n<\/tr>\n
8<\/td>\nINTRODUCTION <\/td>\n<\/tr>\n
9<\/td>\n1 Scope
2 Normative references
3 Terms, definitions and abbreviations <\/td>\n<\/tr>\n
10<\/td>\n3.1 Definitions <\/td>\n<\/tr>\n
13<\/td>\n3.2 Abbreviations
4 Overview
4.1 General <\/td>\n<\/tr>\n
14<\/td>\n4.2 Objectives
Figures
Figure 1 \u2013 Overview of the RCM process <\/td>\n<\/tr>\n
16<\/td>\n4.3 Types of maintenance
Figure 2 \u2013 Evolution of an RCM maintenance programme <\/td>\n<\/tr>\n
17<\/td>\n5 RCM initiation and planning
5.1 Objectives for conducting an RCM analysis
Figure 3 \u2013 Types of maintenance tasks <\/td>\n<\/tr>\n
18<\/td>\n5.2 Justification and prioritization
5.3 Links to design and maintenance support <\/td>\n<\/tr>\n
19<\/td>\n5.4 Knowledge and training
5.5 Operating context
Figure 4 \u2013 Relationship between RCM and other support activities <\/td>\n<\/tr>\n
20<\/td>\n5.6 Guidelines and assumptions <\/td>\n<\/tr>\n
21<\/td>\n5.7 Information requirements <\/td>\n<\/tr>\n
22<\/td>\n6 Functional failure analysis
6.1 Principles and objectives
6.2 Requirements for definition of functions <\/td>\n<\/tr>\n
23<\/td>\n6.3 Requirements for definition of functional failures
6.4 Requirements for definition of failure modes <\/td>\n<\/tr>\n
24<\/td>\n6.5 Requirements for definition of failure effects
6.6 Criticality <\/td>\n<\/tr>\n
25<\/td>\n7 Consequence classification and RCM task selection
7.1 Principles and objectives
7.2 RCM decision process <\/td>\n<\/tr>\n
27<\/td>\nFigure 5 \u2013 RCM decision diagram <\/td>\n<\/tr>\n
28<\/td>\n7.3 Consequences of failure
7.4 Failure management policy selection <\/td>\n<\/tr>\n
29<\/td>\n7.5 Task interval <\/td>\n<\/tr>\n
30<\/td>\nFigure 6 \u2013 P-F interval <\/td>\n<\/tr>\n
32<\/td>\n8 Implementation
8.1 Maintenance task details
8.2 Management actions
8.3 Feedback into design and maintenance support <\/td>\n<\/tr>\n
34<\/td>\nFigure 7 \u2013 ILS management process and relationship with RCM analysis <\/td>\n<\/tr>\n
35<\/td>\n8.4 Rationalization of tasks
Figure 8 \u2013 Risk versus cost considerations for rationalization of tasks <\/td>\n<\/tr>\n
36<\/td>\n8.5 Implementation of RCM recommendations
8.6 Age exploration
8.7 Continuous improvement <\/td>\n<\/tr>\n
37<\/td>\n8.8 In-service feedback
Figure 9 \u2013 RCM continuous improvement cycle <\/td>\n<\/tr>\n
39<\/td>\nAnnex A (informative) Criticality analysis <\/td>\n<\/tr>\n
41<\/td>\nTables
Table A.1 \u2013 Example of a criticality matrix <\/td>\n<\/tr>\n
42<\/td>\nAnnex B (informative) Failure finding task intervals <\/td>\n<\/tr>\n
44<\/td>\nAnnex C (informative) Failure patterns
Figure C.1 \u2013 Dominant failure patterns <\/td>\n<\/tr>\n
45<\/td>\nTable C.1 \u2013 Failure pattern categories and frequency of occurrence <\/td>\n<\/tr>\n
46<\/td>\nAnnex D (informative) Application of RCM to structures <\/td>\n<\/tr>\n
49<\/td>\nBibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"

Dependability management – Application guide. Reliability centred maintenance<\/b><\/p>\n\n\n\n\n
Published By<\/td>\nPublication Date<\/td>\nNumber of Pages<\/td>\n<\/tr>\n
BSI<\/b><\/a><\/td>\n2010<\/td>\n52<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":343444,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[94,2641],"product_tag":[],"class_list":{"0":"post-343435","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-03-120-01","7":"product_cat-bsi","9":"first","10":"instock","11":"sold-individually","12":"shipping-taxable","13":"purchasable","14":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/343435","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/343444"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=343435"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=343435"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=343435"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}