{"id":255296,"date":"2024-10-19T16:52:33","date_gmt":"2024-10-19T16:52:33","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-en-iso-15118-12015\/"},"modified":"2024-10-25T12:19:24","modified_gmt":"2024-10-25T12:19:24","slug":"bs-en-iso-15118-12015","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-en-iso-15118-12015\/","title":{"rendered":"BS EN ISO 15118-1:2015"},"content":{"rendered":"
ISO 15118<\/span> <\/span> specifies the communication between Electric Vehicles (EV), including Battery Electric Vehicles and Plug-In Hybrid Electric Vehicles, and the Electric Vehicle Supply Equipment (EVSE). As the communication parts of this generic equipment are the Electric Vehicle Communication Controller (EVCC) and the Supply Equipment Communication Controller (SECC), ISO 15118<\/span> <\/span> describes the communication between these components. Although ISO 15118<\/span> <\/span> is oriented to the charging of electric road vehicles, it is open for other vehicles as well.<\/p>\n This part of ISO 15118<\/span> <\/span> specifies terms and definitions, general requirements and use cases as the basis for the other parts of ISO 15118<\/span> <\/span>. It provides a general overview and a common understanding of aspects influencing the charge process, payment and load levelling.<\/p>\n ISO 15118<\/span> <\/span> does not specify the vehicle internal communication between battery and charging equipment and the communication of the SECC to other actors and equipment (beside some dedicated message elements related to the charging). All connections beyond the SECC, and the method of message exchanging are considered to be out of the scope as specific use cases.<\/p>\n Electric road vehicles specifically are vehicles in categories M (used for carriage of passengers) and N (used for carriage of goods) (compare ECE\/TR ANS\/WP.29\/78 ev.2). This does not prevent vehicles in other categories from adopting ISO 15118<\/span> <\/span> as well.<\/p>\n<\/div>\n This part of ISO 15118<\/span> <\/span> is destined to orientate the message set of ISO 15118\u20112<\/span> <\/span>. The absence of any particular use case in this part of ISO 15118<\/span> <\/span> does not imply that it shall not put into practice, with the required messages.<\/p>\n<\/div>\n This part of ISO 15118<\/span> <\/span> and ISO 15118\u20112<\/span> <\/span> are designed to work independent of data transfer medium used. However, this series of documents are made for fitting the specified data link layers in the corresponding documents in this series.<\/p>\n<\/div>\n Charging infrastructure architecture <\/td>\n<\/tr>\n Security <\/td>\n<\/tr>\n Examples of charging scenarios derived from the use case elements <\/td>\n<\/tr>\n Road vehicles. Vehicle to grid communication interface – General information and use-case definition<\/b><\/p>\nPDF Catalog<\/h4>\n
\n
\n PDF Pages<\/th>\n PDF Title<\/th>\n<\/tr>\n \n 6<\/td>\n Foreword <\/td>\n<\/tr>\n \n 7<\/td>\n Introduction <\/td>\n<\/tr>\n \n 9<\/td>\n Section sec_1
Section sec_2
1\tScope
2\tNormative references <\/td>\n<\/tr>\n\n 10<\/td>\n Section sec_3
Section sec_3.1
Section sec_3.2
Section sec_3.3
Section sec_3.4
Section sec_3.5
Section sec_3.6
Section sec_3.7
Section sec_3.8
Section sec_3.9
Section sec_3.10
Section sec_3.11
3\tTerms and definitions <\/td>\n<\/tr>\n\n 11<\/td>\n Section sec_3.12
Section sec_3.13
Section sec_3.14
Section sec_3.15
Section sec_3.16
Section sec_3.17 <\/td>\n<\/tr>\n\n 12<\/td>\n Section sec_3.18
Section sec_3.19
Section sec_3.20
Section sec_3.21
Section sec_3.22 <\/td>\n<\/tr>\n\n 13<\/td>\n Section sec_3.23
Section sec_3.24
Section sec_3.25
Section sec_3.26
Section sec_3.27
Section sec_3.28
Section sec_3.29
Section sec_3.30
Section sec_3.31 <\/td>\n<\/tr>\n\n 14<\/td>\n Section sec_3.32
Section sec_3.33
Section sec_3.34
Section sec_3.35
Section sec_3.36
Section sec_3.37
Section sec_3.38
Section sec_3.39 <\/td>\n<\/tr>\n\n 15<\/td>\n Section sec_3.40
Section sec_3.41
Section sec_3.42
Section sec_3.43
Section sec_3.44
Section sec_3.45
Section sec_3.46
Section sec_3.47 <\/td>\n<\/tr>\n\n 16<\/td>\n Section sec_3.48
Section sec_3.49
Section sec_3.50
Section sec_3.51
Section sec_3.52
Section sec_3.53
Section sec_3.54 <\/td>\n<\/tr>\n\n 17<\/td>\n Section sec_3.55
Section sec_3.56
Section sec_3.57
Section sec_3.58
Section sec_3.59
Section sec_4
4\tSymbols and abbreviated terms <\/td>\n<\/tr>\n\n 18<\/td>\n Section sec_5
Section sec_5.1
5\tRequirements
5.1\tCommunication concept <\/td>\n<\/tr>\n\n 19<\/td>\n Section sec_5.2
Section sec_5.3
Section sec_5.3.1
5.2\tGeneral considerations
5.3\tUser-specific requirements <\/td>\n<\/tr>\n\n 20<\/td>\n Section sec_5.3.2
Section sec_5.4
5.4\tOEM-specific requirements <\/td>\n<\/tr>\n\n 21<\/td>\n Section sec_5.5
Section sec_5.5.1
Section sec_5.5.2
Section sec_5.5.3
Section sec_5.5.4
5.5\tUtility-specific requirements <\/td>\n<\/tr>\n\n 22<\/td>\n Section sec_6
Section sec_6.1
Figure fig_1
6\tActors
6.1\tGeneral <\/td>\n<\/tr>\n\n 23<\/td>\n Section sec_7
Section sec_7.1
7\tUse Case Elements
7.1\tGeneral <\/td>\n<\/tr>\n\n 24<\/td>\n Figure fig_2
Table tab_1 <\/td>\n<\/tr>\n\n 25<\/td>\n Section sec_7.2
Table tab_2
7.2\t Start of charging process [A] <\/td>\n<\/tr>\n\n 26<\/td>\n Section sec_7.2.1
Table tab_3 <\/td>\n<\/tr>\n\n 27<\/td>\n Section sec_7.2.2
Table tab_4 <\/td>\n<\/tr>\n\n 28<\/td>\n Section sec_7.3
Section sec_7.3.1
Table tab_5
Section sec_7.4
Section sec_7.4.1
Table tab_6
7.3\tCommunication set-up [B]
7.4\tCertificate handling [C] <\/td>\n<\/tr>\n\n 30<\/td>\n Section sec_7.4.2
Table tab_7 <\/td>\n<\/tr>\n\n 31<\/td>\n Section sec_7.5
Section sec_7.5.1
7.5\tIdentification and Authorization [D] <\/td>\n<\/tr>\n\n 32<\/td>\n Figure fig_3 <\/td>\n<\/tr>\n \n 33<\/td>\n Section sec_7.5.2
Table tab_8 <\/td>\n<\/tr>\n\n 34<\/td>\n Section sec_7.5.3
Table tab_9 <\/td>\n<\/tr>\n\n 35<\/td>\n Section sec_7.5.4
Table tab_10 <\/td>\n<\/tr>\n\n 36<\/td>\n Section sec_7.5.5
Table tab_11 <\/td>\n<\/tr>\n\n 37<\/td>\n Section sec_7.6
Section sec_7.6.1
Table tab_12
Section sec_7.6.2
Table tab_13
7.6\tTarget setting and charging scheduling [E] <\/td>\n<\/tr>\n\n 39<\/td>\n Section sec_7.6.3
Table tab_14 <\/td>\n<\/tr>\n\n 42<\/td>\n Section sec_7.6.4
Table tab_15
Section sec_7.6.5
Table tab_16 <\/td>\n<\/tr>\n\n 44<\/td>\n Section sec_7.7
Section sec_7.7.1
Table tab_17
7.7\tCharging controlling and re-scheduling [F] <\/td>\n<\/tr>\n\n 45<\/td>\n Section sec_7.7.2
Table tab_18 <\/td>\n<\/tr>\n\n 46<\/td>\n Section sec_7.7.3
Table tab_19 <\/td>\n<\/tr>\n\n 47<\/td>\n Section sec_7.7.4
Table tab_20 <\/td>\n<\/tr>\n\n 48<\/td>\n Section sec_7.7.5
Table tab_21
Section sec_7.7.6
Table tab_22 <\/td>\n<\/tr>\n\n 50<\/td>\n Section sec_7.8
Section sec_7.8.1
Table tab_23
7.8\tValue Added Services [G] <\/td>\n<\/tr>\n\n 51<\/td>\n Section sec_7.8.2
Table tab_24
Section sec_7.9
7.9\tEnd of charging process [H] <\/td>\n<\/tr>\n\n 52<\/td>\n Section sec_7.9.1
Table tab_25 <\/td>\n<\/tr>\n\n 53<\/td>\n Annex sec_A
Annex sec_A.1
Annex sec_A.1.1
Annex sec_A.1.2
Annex sec_A.1.3
Table tab_A.1
Annex\u00a0A
\n(informative)<\/p>\n\n 54<\/td>\n Annex sec_A.1.4 <\/td>\n<\/tr>\n \n 55<\/td>\n Table tab_b
Figure fig_A.1
Table tab_c
Figure fig_A.2 <\/td>\n<\/tr>\n\n 56<\/td>\n Table tab_d
Figure fig_A.3
Annex sec_A.2 <\/td>\n<\/tr>\n\n 57<\/td>\n Figure fig_A.4 <\/td>\n<\/tr>\n \n 58<\/td>\n Annex sec_A.3 <\/td>\n<\/tr>\n \n 59<\/td>\n Table tab_e
Figure fig_A.5 <\/td>\n<\/tr>\n\n 60<\/td>\n Figure fig_A.6
Table tab_A.2 <\/td>\n<\/tr>\n\n 62<\/td>\n Table tab_A.3 <\/td>\n<\/tr>\n \n 63<\/td>\n Annex sec_B
Annex sec_B.1
Annex sec_B.1.1
Table tab_B.1
Annex\u00a0B
\n(informative)<\/p>\n\n 64<\/td>\n Annex sec_B.1.2
Annex sec_B.1.2.1
Annex sec_B.1.2.2 <\/td>\n<\/tr>\n\n 65<\/td>\n Table tab_B.2
Annex sec_B.1.2.3
Table tab_B.3
Annex sec_B.1.3
Table tab_B.4 <\/td>\n<\/tr>\n\n 66<\/td>\n Table tab_B.5
Annex sec_B.1.4 <\/td>\n<\/tr>\n\n 67<\/td>\n Table tab_B.6 <\/td>\n<\/tr>\n \n 68<\/td>\n Annex sec_C
Annex sec_C.1
Annex sec_C.2
Figure fig_C.1
Annex\u00a0C
\n(informative)<\/p>\n\n 69<\/td>\n Annex sec_C.3
Figure fig_C.2 <\/td>\n<\/tr>\n\n 70<\/td>\n Annex sec_C.4
Figure fig_C.3 <\/td>\n<\/tr>\n\n 71<\/td>\n Annex sec_C.5
Figure fig_C.4 <\/td>\n<\/tr>\n\n 73<\/td>\n Reference ref_1
Reference ref_2
Reference ref_3
Reference ref_4
Reference ref_5
Reference ref_6
Reference ref_7
Reference ref_8
Reference ref_9
Reference ref_10
Reference ref_11
Bibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"\n\n
\n Published By<\/td>\n Publication Date<\/td>\n Number of Pages<\/td>\n<\/tr>\n \n BSI<\/b><\/a><\/td>\n 2015<\/td>\n 76<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":255299,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[2641],"product_tag":[],"class_list":{"0":"post-255296","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-bsi","8":"first","9":"instock","10":"sold-individually","11":"shipping-taxable","12":"purchasable","13":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/255296","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/255299"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=255296"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=255296"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=255296"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}