{"id":154489,"date":"2024-10-19T09:11:36","date_gmt":"2024-10-19T09:11:36","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/ca-dsa-152-inspectioncardmanual-2013\/"},"modified":"2024-10-25T01:27:14","modified_gmt":"2024-10-25T01:27:14","slug":"ca-dsa-152-inspectioncardmanual-2013","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/ca\/ca-dsa-152-inspectioncardmanual-2013\/","title":{"rendered":"CA DSA 152 INSPECTIONCARDMANUAL 2013"},"content":{"rendered":"

None<\/p>\n

PDF Catalog<\/h4>\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n
PDF Pages<\/th>\nPDF Title<\/th>\n<\/tr>\n
15<\/td>\nPREFACE <\/td>\n<\/tr>\n
18<\/td>\n1 ADMINISTRATION <\/td>\n<\/tr>\n
19<\/td>\n1.1 Project Inspection Card (IC) Correlation Matrix <\/td>\n<\/tr>\n
46<\/td>\n1.2 Jobsite Documents
1.2.1 Required Prior to Construction
1.2.2 Required During Construction <\/td>\n<\/tr>\n
49<\/td>\n1.2.2.1 Deferred Submittals
1.2.2.2 Construction Change Documents, Type A <\/td>\n<\/tr>\n
50<\/td>\n1.2.2.3 Notice of Deviations\/Resolution of Deviations
1.2.2.4 Interim Verified Reports <\/td>\n<\/tr>\n
51<\/td>\n1.2.3 Required After Construction Completion <\/td>\n<\/tr>\n
52<\/td>\n1.2.4 Codes and Referenced Standards <\/td>\n<\/tr>\n
54<\/td>\n1.3 Proprietary Products <\/td>\n<\/tr>\n
56<\/td>\n1.4 DSA Links <\/td>\n<\/tr>\n
57<\/td>\n2 STRUCTURAL SAFETY INSPECTION ITEMS <\/td>\n<\/tr>\n
59<\/td>\n2.1 Soils
2.1.1 Grading
2.1.1.1 Site <\/td>\n<\/tr>\n
63<\/td>\n2.1.1.2 Building Pad <\/td>\n<\/tr>\n
64<\/td>\n2.1.1.3 Underground Utilities <\/td>\n<\/tr>\n
66<\/td>\n2.1.2 Soil Remediation <\/td>\n<\/tr>\n
67<\/td>\n2.1.2.1 Clay
2.1.2.2 Soil Densification
2.1.2.3 Stone Columns
2.1.3 Earth Retaining Structures <\/td>\n<\/tr>\n
68<\/td>\n2.1.3.1 Segmental Retaining Walls <\/td>\n<\/tr>\n
71<\/td>\n2.1.3.2 Masonry Retaining Wall <\/td>\n<\/tr>\n
72<\/td>\n2.1.3.3 Concrete Retaining Wall
2.1.4 Anchors <\/td>\n<\/tr>\n
73<\/td>\n2.1.4.1 Soil Nails
2.1.4.2 Tie Backs
2.1.4.3 Prestressed Rock and Soil Foundation Anchors <\/td>\n<\/tr>\n
76<\/td>\n2.2 Foundation Systems
2.2.1 Shallow Foundations
2.2.1.1 Concrete Foundations <\/td>\n<\/tr>\n
77<\/td>\n2.2.1.1.1 Footings <\/td>\n<\/tr>\n
78<\/td>\n2.2.1.1.2 Concrete Grade Beams\/Combined Concrete Footings
2.2.1.1.3 Concrete Mat
2.2.1.1.4 Pile Caps
2.2.2 Deep Foundations <\/td>\n<\/tr>\n
79<\/td>\n2.2.2.1 Driven Deep Foundations (Piles) <\/td>\n<\/tr>\n
81<\/td>\n2.2.2.1.1 Steel Piles
2.2.2.1.1.1 Helical Piles <\/td>\n<\/tr>\n
82<\/td>\n2.2.2.1.2 Composite Steel Piles
2.2.2.1.3 Concrete Piles
2.2.2.1.3.1 Concrete Filled Piles
2.2.2.1.3.2 Prestressed Piles
2.2.2.1.3.3 Precast <\/td>\n<\/tr>\n
83<\/td>\n2.2.2.2 Cast-In-Place Deep Foundations (Piers) <\/td>\n<\/tr>\n
85<\/td>\n2.2.2.3 Micropiles <\/td>\n<\/tr>\n
86<\/td>\n2.2.2.4 Compacted Aggregate Piers\/Rammed Aggregate Piers\/Vibro Stone Columns <\/td>\n<\/tr>\n
88<\/td>\n2.3 Gravity Framing Systems
2.3.1 Concrete
2.3.1.1 Cast In Place (CIP) Concrete <\/td>\n<\/tr>\n
97<\/td>\n2.3.1.2 Prestressed\/Post-tension Concrete <\/td>\n<\/tr>\n
98<\/td>\n2.3.1.3 Precast Concrete <\/td>\n<\/tr>\n
99<\/td>\n2.3.1.4 Concrete Walls
2.3.1.4.1 CIP
2.3.1.4.2 Tilt-up <\/td>\n<\/tr>\n
100<\/td>\n2.3.1.4.3 Shotcrete <\/td>\n<\/tr>\n
101<\/td>\n2.3.1.5 Concrete Columns
2.3.1.5.1 CIP
2.3.1.5.2 Prestressed\/Post-tension
2.3.1.5.3 Precast
2.3.1.6 Concrete Beams
2.3.1.6.1 CIP
2.3.1.6.2 Prestressed\/Post-tension
2.3.1.6.3 Precast <\/td>\n<\/tr>\n
102<\/td>\n2.3.1.7 Concrete Floor\/Roof
2.3.1.7.1 CIP
2.3.1.7.2 Prestressed\/Post-tension
2.3.1.7.3 Precast <\/td>\n<\/tr>\n
103<\/td>\n2.3.2 Masonry <\/td>\n<\/tr>\n
109<\/td>\n2.3.2.1 Masonry Walls
2.3.2.2 Masonry Columns\/Pilasters
2.3.2.3 Masonry Piers <\/td>\n<\/tr>\n
110<\/td>\n2.3.3 Wood <\/td>\n<\/tr>\n
126<\/td>\n2.3.3.1 Walls <\/td>\n<\/tr>\n
129<\/td>\n2.3.3.2 Floor\/Roof <\/td>\n<\/tr>\n
130<\/td>\n2.3.4 Steel
2.3.4.1 Structural Steel <\/td>\n<\/tr>\n
136<\/td>\n2.3.4.1.1 Beams
2.3.4.1.1.1 Composite <\/td>\n<\/tr>\n
137<\/td>\n2.3.4.1.1.2 Steel Joists\/Joist Girders\/Trusses <\/td>\n<\/tr>\n
139<\/td>\n2.3.4.1.2 Columns
2.3.4.1.2.1 Composite
2.3.4.2 Cold Formed Steel <\/td>\n<\/tr>\n
144<\/td>\n2.3.4.2.1 Cold Formed Steel Light Frame Construction <\/td>\n<\/tr>\n
146<\/td>\n2.3.4.2.1.1 Walls <\/td>\n<\/tr>\n
149<\/td>\n2.3.4.2.2 Floor\/Roof
2.3.4.2.2.1 Studs, Joists, Rafters, Trusses <\/td>\n<\/tr>\n
150<\/td>\n2.3.4.2.2.2 Steel Deck <\/td>\n<\/tr>\n
154<\/td>\n2.4 Lateral Force Resisting Systems
2.4.1 Concrete
2.4.1.1 Special Reinforced Shear Wall <\/td>\n<\/tr>\n
155<\/td>\n2.4.1.2 Intermediate Precast Shear Wall
2.4.1.3 Special Reinforced Moment Frame
2.4.2 Masonry
2.4.2.1 Special Reinforced Shear Wall <\/td>\n<\/tr>\n
156<\/td>\n2.4.3 Wood
2.4.3.1 Wood Structural Panel
2.4.3.1.1 Light Wood Framing <\/td>\n<\/tr>\n
162<\/td>\n2.4.3.1.2 Cold Formed Steel Light Frame Construction
2.4.4 Steel
2.4.4.1 Structural Steel <\/td>\n<\/tr>\n
163<\/td>\n2.4.4.1.1 Moment Frame <\/td>\n<\/tr>\n
165<\/td>\n2.4.4.1.1.1 Special Moment Frame (SMF) <\/td>\n<\/tr>\n
168<\/td>\n2.4.4.1.1.2 Intermediate Moment Frame (IMF)
2.4.4.1.1.3 Ordinary Moment Frame (OMF)
2.4.4.1.1.4 Special Truss Moment Frame (STMF)
2.4.4.1.2 Braced Frame <\/td>\n<\/tr>\n
169<\/td>\n2.4.4.1.2.1 Special Concentric Braced Frame (SCBF) <\/td>\n<\/tr>\n
170<\/td>\n2.4.4.1.2.2 Ordinary Concentric Braced Frame (OCBF)
2.4.4.1.2.3 Eccentric Braced Frame (EBF)
2.4.4.1.2.4 Buckling Restrained Braced Frame (BRBF)
2.4.4.1.3 Special Plate Shear Wall (SPSW)
2.4.4.1.4 Cantilever Column Systems
2.4.4.2 Cold Formed Steel Light Frame Construction <\/td>\n<\/tr>\n
171<\/td>\n2.4.4.2.1 Steel Sheet <\/td>\n<\/tr>\n
172<\/td>\n2.4.4.2.2 Steel Flat Strap Bracing <\/td>\n<\/tr>\n
173<\/td>\n2.5 Non-Structural Component Support\/Bracing\/Anchorage
2.5.1 Mechanical\/Electrical\/Plumbing Equipment <\/td>\n<\/tr>\n
174<\/td>\n2.5.1.1 Floor\/Roof Mounted
2.5.1.2 Wall Mounted
2.5.1.3 Suspended\/Hung <\/td>\n<\/tr>\n
175<\/td>\n2.5.2 Architectural Items
2.5.2.1 Walls
2.5.2.1.1 Interior
2.5.2.1.1.1 Casework\/Lockers <\/td>\n<\/tr>\n
176<\/td>\n2.5.2.1.1.2 Glass Panel Railing
2.5.2.1.2 Exterior
2.5.2.1.2.1 Veneer OR Glass Block <\/td>\n<\/tr>\n
177<\/td>\n2.5.2.1.2.2 Screen Walls
2.5.2.1.2.3 Casework\/Lockers <\/td>\n<\/tr>\n
178<\/td>\n2.5.2.2 Floors
2.5.2.2.1 Computer Access Floors
2.5.2.3 Ceilings
2.5.2.3.1 Metal Suspension Systems for Lay-In Panel Ceilings
2.5.2.3.2 Soffits <\/td>\n<\/tr>\n
181<\/td>\n2.5.2.4 Roofs
2.5.2.4.1 Roof Tile
2.5.2.4.2 Standing Seam Roofing <\/td>\n<\/tr>\n
182<\/td>\n2.5.2.4.3 Solar Photovoltaic and Thermal Systems <\/td>\n<\/tr>\n
183<\/td>\n2.6 Non-Structural Requirements
2.6.1 Weather Protection
2.6.1.1 Roofing <\/td>\n<\/tr>\n
185<\/td>\n2.6.1.2 Exterior Walls <\/td>\n<\/tr>\n
186<\/td>\n2.6.1.3 Ventilation <\/td>\n<\/tr>\n
188<\/td>\n2.7 Specialty Structures and Items
2.7.1 Steel Storage Racks <\/td>\n<\/tr>\n
189<\/td>\n2.7.2 Walk-In Freezers and Cold Storage Boxes
2.7.3 Remotely Fabricated Structures or Structural Elements <\/td>\n<\/tr>\n
190<\/td>\n2.7.3.1 Elevators
2.7.3.2 Relocatable Buildings <\/td>\n<\/tr>\n
191<\/td>\n2.7.3.2.1 Single Story Buildings
2.7.3.2.2 Multi-Level Buildings
2.7.3.3 Reviews Stands, Grandstands, and Bleachers
2.7.4 Wind Turbines <\/td>\n<\/tr>\n
192<\/td>\n3 FIRE\/LIFE SAFETY INSPECTION ITEMS <\/td>\n<\/tr>\n
193<\/td>\n3.1 Site Issues <\/td>\n<\/tr>\n
195<\/td>\n3.2 General Building Characteristics
3.2.1 Use\/Occupancy <\/td>\n<\/tr>\n
197<\/td>\n3.2.2 Type of construction <\/td>\n<\/tr>\n
198<\/td>\n3.2.3 Setbacks and Yards <\/td>\n<\/tr>\n
199<\/td>\n3.3 Fire\/Smoke Protection
3.3.1 Fire\/Smoke Alarms <\/td>\n<\/tr>\n
201<\/td>\n3.3.2 Automatic Fire Suppression Systems <\/td>\n<\/tr>\n
208<\/td>\n3.3.3 Other Extinguishing Systems <\/td>\n<\/tr>\n
210<\/td>\n3.3.4 Smoke Control Systems <\/td>\n<\/tr>\n
211<\/td>\n3.3.5 Fire-Rated Assemblies
3.3.5.1 Walls <\/td>\n<\/tr>\n
213<\/td>\n3.3.5.2 Horizontal Projections <\/td>\n<\/tr>\n
214<\/td>\n3.3.5.3 Horizontal Assemblies \u2013 Floor\/Ceiling and Roof\/Ceiling <\/td>\n<\/tr>\n
215<\/td>\n3.3.5.4 Shaft Enclosures <\/td>\n<\/tr>\n
216<\/td>\n3.3.5.4.1 Elevators <\/td>\n<\/tr>\n
218<\/td>\n3.3.5.5 Penetrations of Assemblies <\/td>\n<\/tr>\n
219<\/td>\n3.3.5.6 Openings in Rated Assemblies (Opening Protectives) <\/td>\n<\/tr>\n
221<\/td>\n3.3.6 Fire Proofing of Structural Members <\/td>\n<\/tr>\n
222<\/td>\n3.3.7 Concealed Spaces <\/td>\n<\/tr>\n
224<\/td>\n3.4 Hazardous Materials <\/td>\n<\/tr>\n
226<\/td>\n3.5 Means of Egress
3.5.1 Fire\/Smoke Protection of Means of Egress <\/td>\n<\/tr>\n
230<\/td>\n4 ACCESS COMPLIANCE INSPECTION ITEMS <\/td>\n<\/tr>\n
232<\/td>\n4.1 Site <\/td>\n<\/tr>\n
233<\/td>\n4.1.1 Parking
4.1.2 Signage <\/td>\n<\/tr>\n
234<\/td>\n4.1.3 Walks <\/td>\n<\/tr>\n
235<\/td>\n4.1.4 Curb Ramps
4.1.5 Ramps and Landings <\/td>\n<\/tr>\n
236<\/td>\n4.1.6 Stairs and Landings <\/td>\n<\/tr>\n
237<\/td>\n4.1.7 Gates <\/td>\n<\/tr>\n
238<\/td>\n4.2 Building
4.2.1 Signage <\/td>\n<\/tr>\n
239<\/td>\n4.2.2 Hallways, Corridors, Vestibules
4.2.3 Ramps and Landings <\/td>\n<\/tr>\n
240<\/td>\n4.2.4 Stairs and Landings
4.2.5 Elevators and Lifts <\/td>\n<\/tr>\n
241<\/td>\n4.2.6 Doors and Hardware <\/td>\n<\/tr>\n
242<\/td>\n4.2.7 Plumbing Fixtures <\/td>\n<\/tr>\n
243<\/td>\n4.2.7.1 Drinking Fountains
4.2.8 Cabinets and Counters <\/td>\n<\/tr>\n
244<\/td>\n4.2.9 Alarms and Fire Extinguishers <\/td>\n<\/tr>\n
245<\/td>\n4.2.10 Public Telephones <\/td>\n<\/tr>\n
246<\/td>\n4.2.11 Restrooms
4.2.11.1 Water Closet and Water Closet Compartments <\/td>\n<\/tr>\n
247<\/td>\n4.2.11.2 Grab Bars
4.2.11.3 Accessories <\/td>\n<\/tr>\n
248<\/td>\n4.2.11.4 Lavatories
4.2.11.5 Urinals <\/td>\n<\/tr>\n
249<\/td>\n4.2.11.6 Showers and Locker Areas <\/td>\n<\/tr>\n
250<\/td>\n5 OTHER BUILDING COMPONENTS AND SYSTEMS <\/td>\n<\/tr>\n
255<\/td>\n5.1 Mechanical <\/td>\n<\/tr>\n
264<\/td>\n5.2 Plumbing (Including Wet-Side Mechanical) <\/td>\n<\/tr>\n
269<\/td>\n5.3 Gas <\/td>\n<\/tr>\n
271<\/td>\n5.4 Electrical <\/td>\n<\/tr>\n
279<\/td>\n5.4.1 Emergency and Standby Power Systems <\/td>\n<\/tr>\n
281<\/td>\n5.5 Signal <\/td>\n<\/tr>\n
282<\/td>\nAPPENDIX A \u2013 DSA 103 CORRELATION MATRIX <\/td>\n<\/tr>\n
327<\/td>\nAPPENDIX B \u2013 REFERENCED DSA FORMS <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"

CA DSA: DSA 152 Manual: A Guide for Completing the Project Inspection Card<\/b><\/p>\n\n\n\n\n
Published By<\/td>\nPublication Date<\/td>\nNumber of Pages<\/td>\n<\/tr>\n
CA<\/b><\/a><\/td>\n2013<\/td>\n343<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":154495,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[2720],"product_tag":[],"class_list":{"0":"post-154489","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-ca","8":"first","9":"instock","10":"sold-individually","11":"shipping-taxable","12":"purchasable","13":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/154489","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/154495"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=154489"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=154489"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=154489"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}