{"id":126023,"date":"2024-10-19T05:31:00","date_gmt":"2024-10-19T05:31:00","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/ieee-286-2024-2\/"},"modified":"2024-10-24T23:17:27","modified_gmt":"2024-10-24T23:17:27","slug":"ieee-286-2024-2","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/ieee\/ieee-286-2024-2\/","title":{"rendered":"IEEE 286-2024"},"content":{"rendered":"
Revision Standard – Active. Covered in this recommended practice are power factor and power factor tip-up testing of stator coils and bars for use in large electric machinery. This document also defines power factor, tangent delta, dissipation factor, and conversions between these values.<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
1<\/td>\n | IEEE Std 286\u2122-2024 Front cover <\/td>\n<\/tr>\n | ||||||
2<\/td>\n | Title page <\/td>\n<\/tr>\n | ||||||
4<\/td>\n | Important Notices and Disclaimers Concerning IEEE Standards Documents <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | Participants <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | Introduction <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | Contents <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | 1.\u2002Overview 1.1\u2002Scope 1.2\u2002Purpose 1.3\u2002Word usage <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | 2.\u2002Normative references 3.\u2002Definitions <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | 4.\u2002Theory of measurements 4.1\u2002Bridge power factor measurement <\/td>\n<\/tr>\n | ||||||
20<\/td>\n | 4.2\u2002Digital power factor measurement <\/td>\n<\/tr>\n | ||||||
23<\/td>\n | 5.\u2002Applications 6.\u2002Interpretation <\/td>\n<\/tr>\n | ||||||
24<\/td>\n | 7.\u2002Test parameters <\/td>\n<\/tr>\n | ||||||
26<\/td>\n | 8.\u2002Coil or bar screening and stress control coating 8.1\u2002Guarding techniques <\/td>\n<\/tr>\n | ||||||
30<\/td>\n | 9.\u2002Testing of individual coils 9.1\u2002Required equipment <\/td>\n<\/tr>\n | ||||||
31<\/td>\n | 9.2\u2002Test procedure for individual coils <\/td>\n<\/tr>\n | ||||||
33<\/td>\n | 10.\u2002Testing complete windings <\/td>\n<\/tr>\n | ||||||
34<\/td>\n | 10.1\u2002Required equipment <\/td>\n<\/tr>\n | ||||||
35<\/td>\n | 10.2\u2002Test voltage <\/td>\n<\/tr>\n | ||||||
36<\/td>\n | 10.3\u2002Power factor tip-up 10.4\u2002Test procedure <\/td>\n<\/tr>\n | ||||||
41<\/td>\n | 10.5\u2002Analysis <\/td>\n<\/tr>\n | ||||||
43<\/td>\n | Annex A (informative) Bibliography <\/td>\n<\/tr>\n | ||||||
44<\/td>\n | Back cover <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" IEEE Recommended Practice for Measurement of Power Factor Tip-Up of Electric Machinery Stator Coil Insulation (Approved Draft)<\/b><\/p>\n |