{"id":110455,"date":"2024-10-18T15:54:41","date_gmt":"2024-10-18T15:54:41","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/ca-referencedstandardscode-2013\/"},"modified":"2024-10-24T21:57:23","modified_gmt":"2024-10-24T21:57:23","slug":"ca-referencedstandardscode-2013","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/ca\/ca-referencedstandardscode-2013\/","title":{"rendered":"CA ReferencedStandardsCode 2013"},"content":{"rendered":"

The California Referenced Standards Code (CRSC) contains minimum test and referenced standards required by the California Building Standards Code.<\/p>\n

PDF Catalog<\/h4>\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n
PDF Pages<\/th>\nPDF Title<\/th>\n<\/tr>\n
1<\/td>\n2013 CALIFORNIA REFERENCED STANDARDS CODE CALIFORNIA CODE OF REGULATIONS TITLE 24, PART 12 <\/td>\n<\/tr>\n
2<\/td>\n2013 CALIFORNIA REFERENCED STANDARDS CODE CALIFORNIA CODE OF REGULATIONS TITLE 24, PART 12 TITLE PAGE <\/td>\n<\/tr>\n
3<\/td>\nCOPYRIGHT <\/td>\n<\/tr>\n
4<\/td>\nPREFACE
ACKNOWLEDGEMENTS <\/td>\n<\/tr>\n
6<\/td>\nCALIFORNIA CODE OF REGULATIONS, TITLE 24 CALIFORNIA AGENCY INFORMATION CONTACT LIST <\/td>\n<\/tr>\n
8<\/td>\nHOW TO DETERMINE WHERE CHANGES HAVE BEEN MADE <\/td>\n<\/tr>\n
10<\/td>\nTABLE OF CONTENTS <\/td>\n<\/tr>\n
12<\/td>\nCHAPTER 12-1 ADMINISTRATION
SECTION 12-1-101 TITLE, PURPOSE AND SCOPE
SECTION 12-1-106 PERMITS <\/td>\n<\/tr>\n
14<\/td>\nCHAPTER 12-3 RELEASING SYSTEMS FOR SECURITY BARS IN DWELLINGS
INTRODUCTION
SECTION 12-3-1 SCOPE
SECTION 12-3-2 GENERAL <\/td>\n<\/tr>\n
15<\/td>\nCONSTRUCTION
SECTION 12-3-3 ASSEMBLY
SECTION 12-3-4 MATERIALS <\/td>\n<\/tr>\n
16<\/td>\nPERFORMANCE
SECTION 12-3-5 TEST SETUP AND SAMPLE PREPARATION <\/td>\n<\/tr>\n
17<\/td>\nSECTION 12-3-6 SECURE ATTACHMENT TEST
SECTION 12-3-7 OPERATION TEST
SECTION 12-3-8 MANUAL ACTUATION TEST
SECTION 12-3-9 ENDURANCE TEST
SECTION 12-3-10 ENVIRONMENTAL EXPOSURE TEST <\/td>\n<\/tr>\n
18<\/td>\nSECTION 12-3-11 ABUSE TEST
MARKINGS AND INSTRUCTIONS
SECTION 12-3-12 MARKINGS
SECTION 12-3-13 INSTRUCTION MANUAL <\/td>\n<\/tr>\n
20<\/td>\nCHAPTER 12-4A LABORATORY ANIMAL QUARTER STANDARDS
STANDARD 12-4A-1 <\/td>\n<\/tr>\n
22<\/td>\nCHAPTER 12-4-1 STAGE AND PLATFORMS
SMOKE OR HEAT VENTILATORS STANDARD 12-4-1
STATE FIRE MARSHAL SMOKE OR HEAT VENTILATORS <\/td>\n<\/tr>\n
24<\/td>\nCHAPTER 12-7-1 FIRE-RESISTIVE STANDARDS
FIRE TESTS OF BUILDING CONSTRUCTION AND MATERIALS STANDARD 12-7-1
SCOPE
FIRE TESTING FURNACES AND CONTROL
UNEXPOSED SURFACE TEMPERATURES
CLASSIFICATION AS DETERMINED BY TEST <\/td>\n<\/tr>\n
25<\/td>\nTEST SPECIMEN
DURATION AND CONDUCT OF TESTS <\/td>\n<\/tr>\n
26<\/td>\nTESTS OF BEARING WALLS AND PARTITIONS
TESTS OF NONBEARING WALLS AND PARTITIONS
TEST OF COLUMNS <\/td>\n<\/tr>\n
27<\/td>\nALTERNATE TEST OF PROTECTION FOR STRUCTURAL STEEL COLUMNS
TESTS OF FLOORS AND ROOFS <\/td>\n<\/tr>\n
28<\/td>\nTESTS OF LOADED RESTRAINED STRUCTURAL FRAME MEMBERS <\/td>\n<\/tr>\n
29<\/td>\nTESTS OF CEILING CONSTRUCTIONS <\/td>\n<\/tr>\n
30<\/td>\nTESTS OF PROTECTION FOR COMBUSTIBLE FRAMING, OR FOR COMBUSTIBLE FACINGS ON THE UNEXPOSED SIDE OF WALLS, PARTITIONS AND FLOORS
STANDARD FIRE ENDURANCE TEST REPORT FORM <\/td>\n<\/tr>\n
31<\/td>\nTABLE SFM 12-7-1A CONDITIONS FOR HOSE STREAM TEST <\/td>\n<\/tr>\n
32<\/td>\nCHAPTER 12-7-2 FIRE-RESISTIVE STANDARDS RESERVED <\/td>\n<\/tr>\n
34<\/td>\nCHAPTER 12-7-3 FIRE-RESISTIVE STANDARDS
FIRE TESTING FURNACES STANDARD 12-7-3
SCOPE
BURNERS AND FUEL
TIME-TEMPERATURE CURVE <\/td>\n<\/tr>\n
35<\/td>\nFURNACE CONTROL <\/td>\n<\/tr>\n
36<\/td>\nCORRELATION
TABLE 12-7-3A STANDARD TIME-TEMPERATURE CURVE FOR CONTROL OF FIRE TESTS <\/td>\n<\/tr>\n
37<\/td>\nTABLE 12-7-3A\u2014continued STANDARD TIME-TEMPERATURE CURVE FOR CONTROL OF FIRE TESTS <\/td>\n<\/tr>\n
38<\/td>\nFIGURE 12-7-3-1\u2014TIME-TEMPERATURE CURVE <\/td>\n<\/tr>\n
40<\/td>\nCHAPTER 12-7-4 FIRE-RESISTIVE STANDARDS
FIRE DOOR ASSEMBLY TESTS STANDARD 12-7-4
SCOPE
FIRE TESTING FURNACES AND CONTROL
UNEXPOSED SURFACE TEMPERATURES
TEST ASSEMBLIES <\/td>\n<\/tr>\n
41<\/td>\nCONDUCT OF TESTS
REPORT
CONDITIONS OF ACCEPTANCE <\/td>\n<\/tr>\n
43<\/td>\nMARKING
TABLE 12-7-4A HOSE STREAM TEST <\/td>\n<\/tr>\n
44<\/td>\nCHAPTER 12-7-5 FIRE-RESISTIVE STANDARDS
INTERIOR FINISH OF DECORATIVE MATERIAL STANDARD 12-7-5
SCOPE
TEST SETUP AND PERFORMANCE <\/td>\n<\/tr>\n
46<\/td>\nCHAPTER 12-7A MATERIALS AND CONSTRUCTION METHODS FOR EXTERIOR WILDFIRE EXPOSURE
EXTERIOR WALL SIDING AND SHEATHING SFM STANDARD 12-7A-1 <\/td>\n<\/tr>\n
47<\/td>\nFIGURE 1. TEST FIGURE SCHEMATIC
FIGURE 2. GAS BURNER IGNITION SOURCE <\/td>\n<\/tr>\n
50<\/td>\nEXTERIOR WINDOWS SFM STANDARD 12-7A-2 <\/td>\n<\/tr>\n
51<\/td>\nFIGURE 1. SCHEMATIC OF THE WALL ASSEMBLY <\/td>\n<\/tr>\n
52<\/td>\nHORIZONTAL PROJECTCION UNDERSIDE SFM STANDARD 12-7A-3 <\/td>\n<\/tr>\n
53<\/td>\nFIGURE 1. EAVES TEST ASSEMBLY <\/td>\n<\/tr>\n
54<\/td>\nDECKING SFM STANDARD 12-7A-4 <\/td>\n<\/tr>\n
56<\/td>\nFIGURE 1. DECK TEST ASSEMBLY (UNDER DECK-FLAME)
FIGURE 2. DECK TEST ASSEMBLY (BURNING-BRAND) <\/td>\n<\/tr>\n
57<\/td>\nDECKING ALTERNATE METHOD A SFM STANDARD 12-7A-4A <\/td>\n<\/tr>\n
59<\/td>\nIGNITION-RESISTANT MATERIAL SFM STANDARD 12-7A-5 <\/td>\n<\/tr>\n
60<\/td>\nCHAPTER 12-8-1 FIRE-RESISTIVE STANDARDS FOR FIRE PROTECTION
STANDARD 12-8-100 ROOM FIRE TEST FOR WALL AND CEILING MATERIALS (See Chapter 35, California Building Code.)
SCOPE
FIRE AND SMOKE MEASUREMENTS AND PHOTOGRAPHIC RECORD <\/td>\n<\/tr>\n
61<\/td>\nREPORT
TEST SAMPLES <\/td>\n<\/tr>\n
62<\/td>\nSUMMARY OF METHOD AND HEAT SOURCE
IGNITION SOURCE AND LOCATION
COMPARTMENT DIMENSIONS AND CONSTRUCTION
SPECIMEN MOUNTING AND TEST MATERIAL SIZE
FIRE COMPARTMENT ENVIRONMENT <\/td>\n<\/tr>\n
63<\/td>\nAMBIENT CONDITIONS IN TEST BUILDING AND FIRE COMPARTMENT
SPECIMEN CONDITIONING
INSTRUMENTATION <\/td>\n<\/tr>\n
64<\/td>\nCALIBRATION AND DOCUMENTATION OF IGNITION SOURCE AND TEST EQUIPMENT <\/td>\n<\/tr>\n
65<\/td>\nTEST PROCEDURE
FLASHOVER AND SMOKE
MARKINGS
TABLE 12-8-1A IGNITION SOURCE RATE OF HEAT RELEASE PROGRAM FOR TESTS OF SAFETY CELL PADDING MATERIALS <\/td>\n<\/tr>\n
66<\/td>\nFIGURE 12-8-1\u2014TIME\u2014MINUTES
FIGURE 12-8-2\u2014LOCATION OF HEAT FLUX METERS <\/td>\n<\/tr>\n
67<\/td>\nFIGURE 12-8-3\u2014ROOM THERMOCOUPLE LOCATIONS <\/td>\n<\/tr>\n
68<\/td>\nFIGURE 12-8-4\u2014SECTION VIEW OF ROOM TEST APPARATUS <\/td>\n<\/tr>\n
69<\/td>\nFIGURE 12-8-5\u2014PLAN VIEW OF CANOPY HOOD
FIGURE 12-8-6\u2014BIDIRECTIONAL PROBE <\/td>\n<\/tr>\n
70<\/td>\nFIGURE 12-8-7\u2014GAS BURNER <\/td>\n<\/tr>\n
71<\/td>\nFIGURE 12-8-8\u2014BURNER GAS FLOW CONTROL AND MEASUREMENT <\/td>\n<\/tr>\n
72<\/td>\nAPPENDIX 12-8-1A CALCULATION OF THE TOTAL RATE OF HEAT AND CARBON MONOXIDE OR CARBON DIOXIDE PRODUCTION
EQUATION 1
EQUATION 2
EQUATION 3
EQUATION 4
EQUATION 5
EQUATION 6
EQUATION 7
EQUATION 8
EQUATION 9
EQUATION 1 0
EQUATION 11
\n <\/td>\n<\/tr>\n
73<\/td>\nEQUATION 12
EQUATION 13
EQUATION 14
EQUATION 15
EQUATION 16
EQUATION 17
EQUATION 18
EQUATION 19
EQUATION 20 <\/td>\n<\/tr>\n
74<\/td>\nAPPENDIX 12-8-1B GUIDE TO MOUNTING TECHNIQUES FOR WALL AND CEILING INTERIOR FINISH MATERIAL
GENERAL
ACOUSTICAL MATERIALS AND OTHER BOARD MATERIALS
BATT OR BLANKET-TYPE INSULATING AND OTHER FLEXIBLE MATERIALS
BUILDING UNITS
COATINGS OR SPRAY APPLIED MATERIALS <\/td>\n<\/tr>\n
75<\/td>\nWALL COVERING MATERIAL
FIGURE 12-8-1B-1\u2014TYPICAL STEEL FRAME SUPPORT SYSTEM
FIGURE 12-8-1B-2\u2014MATERIAL FASTENING TECHNIQUE <\/td>\n<\/tr>\n
76<\/td>\nFIGURE 12-8-1B-3\u2014TYPICAL MOUNTING TECHNIQUE FOR RIGID WALL MATERIALS <\/td>\n<\/tr>\n
77<\/td>\nFIGURE 12-8-1B-4\u2014TYPICAL MOUNTING TECHNIQUE FOR FLEXIBLE WALL MATERIALS <\/td>\n<\/tr>\n
78<\/td>\nFIGURE 12-8-1B-5\u2014TYPICAL MOUNTING TECHNIQUE FOR CEILING MATERIALS <\/td>\n<\/tr>\n
80<\/td>\nCHAPTER 12-10-1 EXITS
POWER-OPERATED EXIT DOORS STANDARD 12-10-1
SCOPE
GENERAL <\/td>\n<\/tr>\n
81<\/td>\nSWINGING DOORS
SLIDING DOORS <\/td>\n<\/tr>\n
82<\/td>\nMARKING <\/td>\n<\/tr>\n
84<\/td>\nCHAPTER 12-10-2 EXITS
SINGLE-POINT LATCHING OR LOCKING DEVICES STANDARD 12-10-2
SCOPE
INSTRUCTIONS
DESIGN <\/td>\n<\/tr>\n
85<\/td>\nCONSTRUCTION MATERIALS
ENDURANCE AND PERFORMANCE TEST PROCEDURES <\/td>\n<\/tr>\n
86<\/td>\nTHICKNESS OF COATINGS TESTS
MARKING <\/td>\n<\/tr>\n
87<\/td>\nFIGURE 12-10-2-1\u2014STATIC LOADING FIXTURE <\/td>\n<\/tr>\n
88<\/td>\nFIGURE 12-10-2-2\u2014ENDURANCE LIFE TESTING APPARATUS <\/td>\n<\/tr>\n
90<\/td>\nCHAPTER 12-10-3 EXITS
EMERGENCY EXIT AND PANIC HARDWARE STANDARD 12-10-3
SCOPE
INSTRUCTIONS
DESIGN
CONSTRUCTION MATERIALS
ENDURANCE AND PERFORMANCE TESTS <\/td>\n<\/tr>\n
91<\/td>\nEMERGENCY OPERATION TEST
MARKING <\/td>\n<\/tr>\n
92<\/td>\nCHAPTERS 12-11A AND 12-11B BUILDING AND FACILITY ACCESS SPECIFICATIONS
PRODUCT APPROVAL FOR DETECTABLE WARNING PRODUCTS AND DIRECTIONAL SURFACES
SCOPE
DETECTABLE WARNING PRODUCTS
DIRECTIONAL SURFACES
INDEPENDENT ENTITY
TWO-YEAR APPROVAL
FEE
DISABILITY ACCESS ACCOUNT
DETECTABLE WARNING PRODUCTS AND DIRECTIONAL SURFACES
SIGNIFICANT DEGRADATION
SELECTION OF INDEPENDENT ENTITY <\/td>\n<\/tr>\n
94<\/td>\nCHAPTER 12-12 ENGINEERING REGULATION\u2014QUALITY AND DESIGN OF THE MATERIALS OF CONSTRUCTION
STANDARD 12-12-1 CALIFORNIA STANDARD FOR EARTHQUAKE-ACTUATED GAS SHUTOFF VALVES (See Chapter 12, California Plumbing Code.)
DIVISION I\u2014CONSTRUCTION
SCOPE <\/td>\n<\/tr>\n
96<\/td>\nCHAPTER 12-13 STANDARDS FOR INSULATING MATERIAL (See Part 6, Title 24, C.C.R.)
ARTICLE 3. STANDARDS FOR INSULATING MATERIAL
APPLICATION AND SCOPE
DEFINITIONS <\/td>\n<\/tr>\n
97<\/td>\nQUALITY STANDARDS <\/td>\n<\/tr>\n
103<\/td>\nUREA FORMALDEHYDE FOAM INSULATION SAFETY NOTICE <\/td>\n<\/tr>\n
104<\/td>\nFIGURE: UREA FORMALDEHYDE FOAM INSULATION FORM <\/td>\n<\/tr>\n
105<\/td>\nAPPROVAL OF TESTING LABORATORIES
CERTIFICATION <\/td>\n<\/tr>\n
106<\/td>\nQUALITY ASSURANCE (RESERVED)
IDENTIFICATION
INSPECTIONS
PERFORMANCE TESTS
COSTS OF INSPECTION AND TESTING (RESERVED)
ENFORCEMENT (RESERVED) <\/td>\n<\/tr>\n
107<\/td>\nRELEASE OF INFORMATION
LIABILITY
INSULATING EXISTING BUILDINGS
INTERPRETATION <\/td>\n<\/tr>\n
108<\/td>\nCHAPTER 12-16-1 ENGINEERING REGULATIONS\u2014QUALITY AND DESIGN OF THE MATERIALS OF CONSTRUCTION
STANDARD 12-16-1 CALIFORNIA STANDARD FOR EARTHQUAKE-ACTUATED AUTOMATIC GAS SHUTOFF SYSTEMS (See Chapter 16, California Building Code and Chapter 12, California Plumbing Code.)
DIVISION I-CONSTRUCTION
SCOPE <\/td>\n<\/tr>\n
110<\/td>\nCHAPTER 12-16-2 ENGINEERING REGULATIONS\u2014QUALITY AND DESIGN OF THE MATERIALS OF CONSTRUCTION
STANDARD 12-16-2 CALIFORNIA STANDARD FOR RESIDENTIAL EXCESS FLOW ACTUATED AUTOMATIC GAS SHUTOFF VALVES (See Chapter 16, California Building Code and for Earthquake-Actuated Gas Shutoff Valves see Section 1211.18, Chapter 12, California Plumbing Code.)
DIVISION 1\u2014CONSTRUCTION
SCOPE <\/td>\n<\/tr>\n
112<\/td>\nCHAPTER 12-31C RADIATION SHIELDING STANDARDS
STANDARD 12-31C-1
ALL HEALING ARTS X-RAY INSTALLATIONS <\/td>\n<\/tr>\n
114<\/td>\nCHAPTER 12-71 AIR FILTERS
AIR FILTERS STANDARD 12-71-1
DESCRIPTION OF TEST APPARATUS, METHOD AND CLASSIFICATION REQUIREMENTS FOR AIR FILTERS <\/td>\n<\/tr>\n
116<\/td>\nCHAPTER 12-72-1 PROTECTIVE SIGNALING SYSTEMS
PROTECTIVE SIGNALING SYSTEMS, STANDARD TEST PROCEDURES STANDARD 12-72-1
SCOPE
TEST REPORTS <\/td>\n<\/tr>\n
117<\/td>\nGENERAL <\/td>\n<\/tr>\n
121<\/td>\nPERFORMANCE <\/td>\n<\/tr>\n
126<\/td>\nPRINTED WIRING BOARDS <\/td>\n<\/tr>\n
127<\/td>\nRELAYS FOR PROTECTIVE SIGNALING SERVICE
SEMICONDUCTOR TESTS
ELECTRICAL RATING <\/td>\n<\/tr>\n
128<\/td>\nTABLE 12-72-1A\u2014CAST-METAL ENCLOSURES
TABLE 12-72-1B\u2014SHEET-METAL ENCLOSURES
TABLE 12-72-1C\u2014MINIMUM ACCEPTABLE SPACINGS IN INCHES1, 2 <\/td>\n<\/tr>\n
129<\/td>\nTABLE 12-72-1D\u2014ENDURANCE TEST <\/td>\n<\/tr>\n
130<\/td>\nCHAPTER 12-72-2 PROTECTIVE SIGNALING SYSTEMS
SINGLE- AND MULTIPLE-STATION FIRE ALARM DEVICES MECHANICALLY OPERATED TYPE STANDARD 12-72-2
SCOPE
TEST REPORTS
GENERAL <\/td>\n<\/tr>\n
131<\/td>\nPERFORMANCE <\/td>\n<\/tr>\n
134<\/td>\nINSTRUCTIONS
MARKING <\/td>\n<\/tr>\n
135<\/td>\nTESTING OVEN <\/td>\n<\/tr>\n
136<\/td>\nTABLE 12-72-2A\u2014TEMPERATURE CLASSIFICATIONS
TABLE 12-72-2B\u2014TEST TEMPERATURES
FIGURE 12-72-2-1\u2014TIME-TEMPERATURE CURVE\u201415-FOOT SPACINGS <\/td>\n<\/tr>\n
137<\/td>\nFIGURE 12-72-2-2\u2014FIRE-TEST LAYOUT <\/td>\n<\/tr>\n
138<\/td>\nFIGURE 12-72-2-3\u2014TEST OVEN <\/td>\n<\/tr>\n
140<\/td>\nCHAPTER 12-72-3 PROTECTIVE SIGNALING SYSTEMS
SMOKE DETECTORS, COMBUSTION PRODUCTS TYPE STANDARD 12-72-3
SCOPE
TEST REPORTS <\/td>\n<\/tr>\n
141<\/td>\nGENERAL <\/td>\n<\/tr>\n
148<\/td>\nPERFORMANCE <\/td>\n<\/tr>\n
157<\/td>\nTESTS ON THERMOPLASTIC MATERIALS <\/td>\n<\/tr>\n
158<\/td>\nTABLE 12-72-3A\u2014CAST-METAL ENCLOSURES
TABLE 12-72-3B\u2014SHEET METAL ENCLOSURES <\/td>\n<\/tr>\n
159<\/td>\nTABLE 12-72-3C\u2014THICKNESS OF GLASS COVERS
TABLE 12-72-3D\u2014THICKNESS OF INSULATING MATERIAL
TABLE 12-72-3E\u2014MINIMUM SPACINGS <\/td>\n<\/tr>\n
160<\/td>\nTABLE 12-72-3F\u2014MAXIMUM TEMPERATURE RISE <\/td>\n<\/tr>\n
161<\/td>\nTABLE 12-72-3G\u2014OBSCURATION\u2014OPTICAL DENSITY CHART (Based on a 5-foot light beam) <\/td>\n<\/tr>\n
162<\/td>\nFIGURE 12-72-3-1\u2014SMOKE DETECTOR TEST CHAMBER
FIGURE 12-72-3-2\u2014FIRE TEST DETECTOR INSTALLATION <\/td>\n<\/tr>\n
163<\/td>\nFIGURE 12-72-3-3\u2014JARRING TEST <\/td>\n<\/tr>\n
164<\/td>\nHISTORY NOTE APPENDIX <\/td>\n<\/tr>\n
166<\/td>\nVALUABLE GUIDES TO CHANGES IN THE 2012 I-CODES\u00ae <\/td>\n<\/tr>\n
167<\/td>\nICC EVALUATION SERVICES <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"

California Referenced Standards Code, Title 24 Part 12 (W\/ ERRATA)<\/b><\/p>\n\n\n\n\n
Published By<\/td>\nPublication Date<\/td>\nNumber of Pages<\/td>\n<\/tr>\n
CA<\/b><\/a><\/td>\n2013<\/td>\n167<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":110456,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[2720],"product_tag":[],"class_list":{"0":"post-110455","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-ca","8":"first","9":"instock","10":"sold-individually","11":"shipping-taxable","12":"purchasable","13":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/110455","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/110456"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=110455"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=110455"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=110455"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}