Shopping Cart

No products in the cart.

BS EN 1366-12:2014

$167.15

Fire resistance tests for service installations – Non-mechanical fire barrier for ventilation ductwork

Published By Publication Date Number of Pages
BSI 2014 36
Guaranteed Safe Checkout
Categories: ,

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

This part of EN 1366 specifies a method for determining the fire resistance of non-mechanical fire barriers installed in fire separating elements designed to withstand heat and the passage of smoke and gases at high temperature. This European Standard is used in conjunction with EN 1363‑1 and EN 1366‑2 .

This European Standard is not suitable for testing non-mechanical fire barriers in suspended ceilings without modification.

This European Standard is not suitable for testing fire dampers, see EN 1366‑2 .

This European Standard is not suitable for testing such products as air transfer grilles, as the pressures and flows involved are different and may cause differing behaviour.

PDF Catalog

PDF Pages PDF Title
4 Contents Page
6 Foreword
7 Introduction
8 1 Scope
2 Normative references
3 Terms and definitions
9 4 Test equipment
4.1 General
4.2 Connecting duct
4.3 Volume flow measuring station
4.4 Condensing unit
10 4.5 Gas temperature measuring devices
4.6 Exhaust fan system
5 Test conditions
6 Test specimen
6.1 Size
6.2 Number of tests
6.2.1 General
11 6.2.2 Supporting construction
6.2.3 Method of installation in the supporting construction
6.2.4 Method of installation on to the supporting construction
6.2.5 Method of installation away from the supporting construction
12 6.3 Design
6.3.1 General
6.3.2 Orientation to be tested
6.3.3 Non-mechanical fire barriers installed within a wall or floor opening
6.3.4 Non-mechanical fire barriers mounted on to the face of a wall or floor
6.3.5 Non-mechanical fire barriers mounted remote from a wall or floor
6.3.5.1 General
6.3.5.2 Non-mechanical fire barriers mounted inside the furnace
6.3.5.3 Non-mechanical fire barriers mounted outside the furnace
13 7 Installation of test specimen
7.1 General
7.2 Supporting construction
Table 1 — Standard floor constructions
7.3 Minimum separation
14 8 Conditioning
8.1 General
8.2 Water-based sealing materials
9 Application of instrumentation
9.1 Thermocouples
9.1.1 Furnace thermocouples (plate thermometers)
9.1.2 Unexposed surface temperature
9.2 Furnace pressure
9.2.1 General
9.2.2 Pressure differential measurement, furnace and connecting duct
15 10 Test procedure
10.1 Determination of leakage of connecting duct and measuring station
10.2 Fire test procedure
16 11 Performance criteria
17 12 Test report
18 13 Field of direct application of test results
13.1 Size of non-mechanical fire barrier
13.2 Non-mechanical fire barriers installed within structural openings
13.3 Non-mechanical fire barriers installed onto the face of a wall or a floor
13.4 Non-mechanical fire barriers remote from a wall or floor
19 13.5 Fire from above
13.6 Separation between non-mechanical fire barriers and between non-mechanical fire barriers and construction elements
13.7 Supporting constructions
21 Figure 1 — Example of general test arrangement
22 Figure 2 — Example of an alternative arrangement when testing non-mechanical fire barriers in floor
23 Figure 3 — Non-mechanical fire barrier mounted in standard supporting construction
24 Figure 4 — Non-mechanical fire barrier mounted onto face of supporting construction within the furnace
25 Figure 5 — Non-mechanical fire barrier mounted onto standard supporting construction outside the furnace
26 Figure 6 — Non-mechanical fire barrier mounted remote from the standard supporting construction and inside the furnace
27 Figure 7 — Non-mechanical fire barrier mounted remote from the standard supporting construction and outside the furnace
28 Figure 8 — Non-mechanical fire barrier mounted in an insulated duct
29 Figure 9 — Detail for the application of thermocouples TS and T1 on the supporting construction at discontinuities
30 Figure 10 — Minimum separation
31 Figure 11 — Non-mechanical fire barriers mounted in different horizontal planes
32 Annex A (normative) EOTA TR026 – Characterization, Aspects of Durability and Factory Production Control for Reactive Materials, Components and Products
33 Bibliography
BS EN 1366-12:2014
$167.15