Shopping Cart

No products in the cart.

AWWA D115 2006

$75.83

AWWA D115-06: Tendon-Prestressed Concrete Water Tanks

Published By Publication Date Number of Pages
AWWA 2006 96
Guaranteed Safe Checkout
Category:

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

This standard covers current and recommended practice for the design, construction, and field observations of concrete tanks using tendons for prestressing.

PDF Catalog

PDF Pages PDF Title
1 ANSI/AWWA D115-06
3 Committee Personnel
5 Contents
7 Foreword
I. Introduction.
9 II. Special Issues.
10 III. Use of This Standard.
13 IV. Modification of Standard.
V. Major Revisions.
VI. Comments.
15 AWWA Standard Tendon-Prestressed
Concrete Water Tanks

SECTION 1: GENERAL
Sec. 1.1 Scope
Sec. 1.2 Definitions
18 Sec. 1.3 References
21 SECTION 2: MATERIALS
Sec. 2.1 Materials
Sec. 2.2 Concrete and Shotcrete
23 Sec. 2.3 Mixing Water
Sec. 2.4 Admixtures
24 Sec. 2.5 Reinforcement
Sec. 2.6 Ducts
Sec. 2.7 Sheathing
25 Sec. 2.8 Elastomeric Materials
26 Sec. 2.9 Epoxy Bonding Agent
Sec. 2.10 Shrinkage Compensating Grout
Sec. 2.11 Steel Corrosion Inhibitor
27 Sec. 2.12 Concrete Coatings
Sec. 2.13 Sealants
SECTION 3: DESIGN
Sec. 3.1 Notation
28 Sec. 3.2 Design Method
29 Sec. 3.3 Design Loads
31 Sec. 3.4 Allowable Stresses
33 Sec. 3.5 Footing Design
34 Sec. 3.6 Floor Design
36 Sec. 3.7 Wall Design
40 Sec. 3.8 Concrete Roofs
41 Sec. 3.9 Dome Roof Design
44 Sec. 3.10 Other Roof Designs
45 Sec. 3.11 Concrete and Shotcrete Cover
46 Sec. 3.12 Additional Considerations in Cold Climates
47 Sec. 3.13 Tank Appurtenances
50 SECTION 4: EARTHQUAKE DESIGN
CONSIDERATIONS
Sec. 4.1 Introduction
Sec. 4.2 Seismic-Design Categories
51 Table 1 Importance factor
Table 2 Response modification factor, R, for type of tank base
Table 3 Soil-profile coefficient
52 Table 4 Zone coefficient
53 Sec. 4.3 Seismic-Design Loads
57 Sec. 4.4 Vertical and Horizontal Forces
58 Sec. 4.5 Other Effects
60 Sec. 4.6 Allowable Stresses
61 Sec. 4.7 Maximum Allowable Coefficient of Friction
Sec. 4.8 Serviceability Requirements
62 Sec. 4.9 Foundation Design
Sec. 4.10 Minimum Freeboard
63 Sec. 4.11 Design for Seismic Effects of Backfill
SECTION 5: CONSTRUCTION PROCEDURES
Sec. 5.1 Scope
Sec. 5.2 Cast-in-Place Concrete
72 Sec. 5.3 Precast Concrete
74 Sec. 5.4 Shotcrete Cover Coats
78 Sec. 5.5 Waterstops and Sealants
Sec. 5.6 Elastomeric Bearing Pads and Sponge Fillers
79 Sec. 5.7 Tolerances
80 Sec. 5.8 Cleaning and Disinfection
Sec. 5.9 Backfill
Sec. 5.10 Electrical Grounding
SECTION 6: WATERTIGHTNESS
Sec. 6.1 General
81 Table 5 Watertightness criteria
82 Sec. 6.2 Testing
83 Sec. 6.3 Repairs
84 SECTION 7: OBSERVATIONS
85 APPENDIX A Bibliography
87 APPENDIX B Observation Procedures

SECTION B.1: SCOPE
SECTION B.2: OBSERVATIONS DURING
CONSTRUCTION
Sec. B.2.1 General
Sec. B.2.2 Observations of cast-in-place concrete construction
90 Sec. B.2.3 Observations of precast panels
Sec. B.2.4 Observations of shotcrete cover coats
91 SECTION B.3: OBSERVATIONS AFTER
CONSTRUCTION
Sec. B.3.1 General
Sec. B.3.2 Watertightness
92 Sec. B.3.3 Walls
Sec. B.3.4 Repairs
Sec. B.3.5 Disinfection
SECTION B.4: OBSERVATIONS DURING ROUTINE
MAINTENANCE
93 Sec. B.4.1 Floor and footing
Sec. B.4.2 Wall
94 Sec. B.4.3 Roof
AWWA D115 2006
$75.83