ASHRAE Guideline 0.2 2015
$54.17
ASHRAE Guideline 0.2-2015 — Commissioning Process for Existing Systems and Assemblies
Published By | Publication Date | Number of Pages |
ASHRAE | 2015 | 80 |
New ASHRAE Guideline 0.2-2015, Commissioning Process for Existing Building Systems and Assemblies, is the comprehensive description of a systematic quality-oriented process that improves the performance and sustainability of existing facilities. This road map includes planning, assessing, investigating, implementing, verifying, and documenting performance to meet defined and optimized operational requirements. The step-by-step process guides owners and facility managers through the process of getting the best effectiveness from their facility for the lowest investment and provides the tools to ensure those benefits last for the life of the building. This guideline was developed by experienced industry practitioners and includes best practices developed through years of successful facility improvements. Guideline 0.2 is intended for use by owners, facility decision makers and commissioning providers who are focused on optimizing the operation of their facilities and systems to achieve specific goals as identified in the Owner’s “Current Facility Requirements.”
PDF Catalog
PDF Pages | PDF Title |
---|---|
1 | ASHRAE Guideline 0.2-2015 |
3 | CONTENTS |
4 | FOREWORD |
5 | 1. PURPOSE 2. SCOPE 3. DEFINITIONS |
6 | 4. PROCESS OVERVIEW |
8 | 5. MULTIPLE-FACILITY PLANNING |
11 | 6. ASSESSMENT |
17 | 7. INVESTIGATION |
23 | 8. IMPLEMENTATION |
27 | 9. HAND-OFF |
29 | 10. ONGOING COMMISSIONING |
32 | INFORMATIVE ANNEX A—GUIDE FOR DEVELOPING SUPPLEMENTARY TECHNICAL GUIDELINES FOR THE COMMISSIONING PROCESS FOR EXISTING BUILDINGS AND ASSEMBLIES |
36 | INFORMATIVE ANNEX B—FLOWCHARTS FOR THE COMMISSIONING PROCESS FOR EXISTING BUILDINGS |
39 | INFORMATIVE ANNEX C1—COST AND BENEFITS OF THE COMMISSIONING PROCESS FOR SYSTEMS IN EXISTING BUILDINGS AND ASSEMBLIES |
41 | INFORMATIVE ANNEX C2—DIFFERENCES BETWEEN THE EXISTING-BUILDING COMMISSIONING PROCESS, AN ENERGY AUDIT, AND A BUILDING TUNE-UP |
44 | INFORMATIVE ANNEX D—DOCUMENTATION MATRIX FOR COMMISSIONING PROCESS FOR EXISTING BUILDINGS AND ASSEMBLIES |
45 | INFORMATIVE ANNEX E—REQUEST FOR QUALIFICATIONS AND TEAM SELECTION |
47 | INFORMATIVE ANNEX F—ROLES AND RESPONSIBILITIES |
49 | INFORMATIVE ANNEX G—EXISTING-BUILDING COMMISSIONING PLANS |
50 | INFORMATIVE ANNEX H—EXISTING-BUILDING COMMISSIONING PROCESS PROGRAM PLAN FOR MULTIPLE FACILITIES |
52 | INFORMATIVE ANNEX I—CURRENT FACILITY REQUIREMENTS WORKSHOP |
55 | INFORMATIVE ANNEX J—CURRENT FACILITY REQUIREMENTS |
58 | INFORMATIVE ANNEX K—EXISTING-BUILDING DOCUMENTATION AND RECORDS |
59 | INFORMATIVE ANNEX L—EXISTING-BUILDING COMMISSIONING PROCESS REPORT |
60 | INFORMATIVE ANNEX L1—ASSESSMENT REPORT |
62 | INFORMATIVE ANNEX L2—INVESTIGATION REPORT |
64 | INFORMATIVE ANNEX L3—IMPLEMENTATION REPORT |
65 | INFORMATIVE ANNEX L4—MEASUREMENT AND VERIFICATION REPORT |
66 | INFORMATIVE ANNEX L5—TRAINING |
70 | INFORMATIVE ANNEX 6—LESSONS-LEARNED WORKSHOP |
71 | INFORMATIVE ANNEX M—SYSTEMS MANUAL |
73 | INFORMATIVE ANNEX M1—FACILITY GUIDE |
75 | INFORMATIVE ANNEX N—ONGOING COMMISSIONING REPORT |
76 | INFORMATIVE ANNEX O—EXISTING-BUILDING COMMISSIONING PROCESS RESOURCES |