Shopping Cart

No products in the cart.

API RP 92P-2019

$35.10

Managed Pressure Drilling Operations — Pressurized Mud Cap Drilling with a Subsea Blowout Preventer

Published By Publication Date Number of Pages
API 2019 67
Guaranteed Safe Checkout
Category:

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

This document addresses recommended practices for pressurized mud cap drilling (PMCD) from a floating rig with a subsea BOP stack. When massive lost circulation conditions are encountered, PMCD can be implemented to allow well construction operations to continue:

Although this document only addresses PMCD, most of the equipment described may also be used for the surface back-pressure (SBP) method of managed pressure drilling. However, much of the equipment used for SBP is not required for PMCD, and will not be covered here.

The following methods, described briefly, are also used during lost circulation conditions; however, they are outside the scope of this document:

a)blind drilling (see 4.3.2);

b)continuous annular injection drilling (see 4.3.3);

c)floating mud cap drilling (see 4.3.4).

API RP 92P-2019
$35.10